21
22.10.2021
TNX65/42
Preparing to transport a machine without milling unit
Attach transport retainers to the control cabinet
• Fit the fixing screw inside the control cabinet.
• Fit the M12 cheese head screw at the pivot point of the control cabinet.
• Secure the locking plate to the machine bed / control cabinet.
(The locking plate must be retained by the customer in case the machine
has to be transported again).
• Attach the retaining bracket to the underside of the control cabinet from the
machine bed. The bracket remains connected to the control cabinet as a
limit stop.
Summary of Contents for TNX42
Page 6: ...6 22 10 2021 TNX65 42 Table of contents...
Page 8: ...8 10 2016 TNX65 42 Safety...
Page 11: ...11 10 2016 TNX65 42 Installation and layout diagrams Installation diagram...
Page 12: ...12 10 2016 TNX65 42 Installation and layout diagrams...
Page 42: ...42 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 43: ...43 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine...
Page 52: ...52 10 2016 TNX65 42 Fuels...
Page 54: ...54 10 2016 TNX65 42 Pneumatic connection...
Page 56: ...56 05 2017 TNX65 42 Electrical connection...
Page 62: ...62 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 63: ......