15
22.10.2021
TNX65/42
General data
Delivery, unloading and transport of the machine from the unloading point to
the installation site must be carefully planned.
Note the size (dimensions) and weight of the individual units.
Any obstacles on the way from the unloading point to the installation site must
be removed before the machine is delivered.
Check the route with regard to load capacity, levelness, pavement damage,
transverse grooves and gradients, both uphill and downhill.
Information on transporting the machine by truck
The truck should have pneumatic suspension in order to avoid major bumps
during transport!
Space required
The following must be assured:
• Sufficient space around the machine.
• Sufficient freedom of movement for the operator.
• Sufficient space for maintenance and repair work.
• All doors on the machine must be able to open completely.
• Space for pallets containing blanks and workpieces, workpiece containers,
chip trolleys, tool trolleys, etc.
The space required can be determined with the aid of the installation drawing.
Summary of Contents for TNX42
Page 6: ...6 22 10 2021 TNX65 42 Table of contents...
Page 8: ...8 10 2016 TNX65 42 Safety...
Page 11: ...11 10 2016 TNX65 42 Installation and layout diagrams Installation diagram...
Page 12: ...12 10 2016 TNX65 42 Installation and layout diagrams...
Page 42: ...42 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Page 43: ...43 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Page 44: ...44 22 10 2021 TNX65 42 Installing the machine...
Page 52: ...52 10 2016 TNX65 42 Fuels...
Page 54: ...54 10 2016 TNX65 42 Pneumatic connection...
Page 56: ...56 05 2017 TNX65 42 Electrical connection...
Page 62: ...62 10 2016 TNX65 42 Alignment component installation and commissioning...
Page 63: ......