3
RTAA-IOM-3
9 Literature Change History
9 Unit Identification
9 Unit Inspection
9 Inspection Checklist
9 Loose Parts Inventory
10
25 Installation - Mechanical, Packaged
— Additional Location
Requirements for Remote
Evaporator Only
— Evaporator Piping Components
— Entering Chilled Water Piping
— Leaving Chilled Water Piping
— Water Pressure Relief Valves
— Domestic Water Heater Piping
— Domestic Water Heater Piping
— Water Pressure Relief Valves
Remote Evaporator
Interconnecting Refrigerant
Piping
Piping Installation Procedures
Refrigerant and Additional Oil
Charge
— Chilled Water Pump Interlock
— Chilled Water Pump Interlock
— Emergency Stop (Normal Trip)
— External Chilled Water Setpoint
(CWS) Remote Resistor/
Potentiometer, Voltage Source
2-10 VDC or Current Source
4-20 mA
— External Current Limit Setpoint
(CLS) Remote Resistor/
Potentiometer, Voltage Source
2-10 VDC or Current Source
4-20 mA
Table of
Contents
World environmental scientists have
concluded, based on the best currently
available evidence, that ozone in our
upper atmosphere is being reduced
due to release of CFC fully halogenated
compounds.
Prior to installation, operation, service
or maintenance on this equipment,
refer to “Refrigerant Emission Control”
in the Periodic Maintenance Section.
Summary of Contents for RTAA-130
Page 2: ... American Standard Inc 1991 ...
Page 8: ...8 RTAA IOM 3 ...
Page 24: ...24 RTAA IOM 3 ...
Page 50: ...50 RTAA IOM 3 Figure 30 Refrigerant Circuit Identification ...
Page 52: ...52 RTAA IOM 3 Figure 31 Remote Evaporator Piping Example ...
Page 59: ...59 RTAA IOM 3 Continued from Previous Page See Notes on Next Page ...
Page 63: ...63 RTAA IOM 3 Continued from Previous Page See Notes on Page 61 ...
Page 65: ...65 RTAA IOM 3 Continued from Previous Page See Notes on Page 61 ...
Page 76: ...76 RTAA IOM 3 ...
Page 92: ...92 RTAA IOM 3 Figure 51 Operator Interface Controls ...
Page 120: ...120 RTAA IOM 3 ...
Page 127: ...127 RTAA IOM 3 Continued from Previous Page 2307 1566C ...
Page 128: ...128 RTAA IOM 3 Figure 57 Unit Sequence of Operation RTAA 130 to 200 Tons 2306 9122A ...
Page 132: ...132 RTAA IOM 3 Figure 58 Operator s Log ...
Page 138: ...138 RTAA IOM 3 ...