Pre-Installation
16
RTHD-SVX01K-EN
Installation Requirements
A list of the contractor responsibilities typically associated
with the unit installation process is provided in
.
Table 4.
Installation requirements
Requirement
Trane Supplied,
Trane Installed
Trane Supplied,
Field Installed
Field Supplied,
Field Installed
Rigging
• Safety chains
• Clevis connectors - Lifting beam
Disassembly/
Reassembly
(as required)
(a)
• Trane, or an agent
of Trane specifically authorized to
perform start-up of Trane
®
products
(contact
your local Trane
office for pricing)
Isolation
• Isolation pads
• Isolation pads
Electrical
• Circuit breakers or non-fused
disconnects (optional)
• Unit-mounted starter
• Circuit breaker or non-fused disconnect
handle
• Temperature sensor (optional outdoor
air)
• Flow switches (may be field-supplied)
• Condenser water regulating valve
controller (optional: may be field-
supplied)
• Circuit breakers or fusible disconnects
(optional)
• Terminal lugs
• Ground connection(s)
• Jumper bars
• BAS wiring (optional)
• IPC wiring
• Control voltage wiring
• High condenser pressure interlock wiring
• Chilled water pump contactor and wiring
• Condenser water pump contactor and
wiring
• Optional relays and wiring
Water piping
• Flow switches (may be field-supplied)
• Condenser water regulating valve
controller
(optional- may be field-supplied)
• Thermometers
• Water flow pressure gauges
• Isolation and balancing valves in water
piping
• Vents and drain valves
• Pressure relief valves
(for water boxes as required)
Pressure Relief
• Relief valves
Vent line and flexible connector
Insulation
• Insulation (optional)
Insulation
Optimus™ RTHD
Installation
Completion Check
Sheet and Request
for Trane Service
(RLC-ADF005*-EN,
see
Chiller Start-up
Commissioning
(b)
• Trane, or an agent of
Trane specifically authorized to
perform start-up of Trane
®
products
(a) Trane, or an agent of Trane specifically authorized to perform start-up and warranty of Trane
®
products, will perform or have direct on-site supervision
of the disassembly and reassembly work.
(b) Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane
®
products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
Summary of Contents for Optimus RTHD
Page 27: ...Installation Mechanical RTHD SVX01K EN 27...
Page 28: ...Installation Mechanical 28 RTHD SVX01K EN...
Page 29: ...Installation Mechanical RTHD SVX01K EN 29...
Page 54: ...Controls 54 RTHD SVX01K EN Figure 23 Tracer TU...
Page 88: ...Log and Check Sheets 88 RTHD SVX01K EN Page Left Intentionally Blank...
Page 95: ...Notes RTAF SVX001K EN 95...