background image

Literature Change History

GPND-IN-1 (August 1997)

Original issue of the manual.

Warnings and Cautions

Warnings and Cautions appear at
appropriate sections throughout
this manual.

WARNINGS!

alert the installer, owner,
operator or service personnel
to potential hazards which if
not avoided could result in
death or serious personal injury.

Cautions:

alert personnel to conditions
which if not avoided may result
in minor or moderate injury.
Also alerts against unsafe prac-
tices causing equipment
damage.

Shipping Instructions

Before installing the nozzle kit, be
sure to confirm that the proper kit
has been sipped.

If a thorough inspection of the kit
reveals damage or material
shortages, file a claim with the
carrier immediately. Specify the
extent and type of damage found,
and notify the appropriate Trane
sales office. Do not install a
damaged nozzle kit without the
Trane sales representative’s
approval!

Description

The nozzle kits are used to direct
discharge air on unit heaters with
a variety of angles available.

Table of Contents

General Information . . . . . . . . . . . . . . . . . . .

2

Literature Change History . . . . . . . . . . . . . . . .

2

Warnings and Cautions . . . . . . . . . . . . . . . . .

2

Description . . . . . . . . . . . . . . . . . . . . . . . .

2

Installation . . . . . . . . . . . . . . . . . . . . . . . .

3

30° Nozzle Kit . . . . . . . . . . . . . . . . . . . . . .

3

45° Nozzle Kit . . . . . . . . . . . . . . . . . . . . . .

4

60° Nozzle Kit . . . . . . . . . . . . . . . . . . . . . .

5

90° Nozzle Kit . . . . . . . . . . . . . . . . . . . . . .

6

5-Way Blow Down Nozzle Kit . . . . . . . . . . . . . .

7

Y-Splitter Nozzle Kit . . . . . . . . . . . . . . . . . . .

7

General Information

2

GPND-IN-1

Summary of Contents for GBPD

Page 1: ...llation Sequence 1 Date August 1997 File No SV TD UH GPND IN 1 897 Supersedes New Installation GPND IN 1 Since the Company has a policy of continuous product improvement it reserves the right to change specifications and design without notice Models GAND GAPD GBND GBPD GCND GCPD GEND GEPD GHND GHPD GKND GKPD GPND GPPD Sizes 100 through 400 American Standard Inc 1997 ...

Page 2: ...nozzle kit be sure to confirm that the proper kit has been sipped If a thorough inspection of the kit reveals damage or material shortages file a claim with the carrier immediately Specify the extent and type of damage found and notify the appropriate Trane sales office Do not install a damaged nozzle kit without the Trane sales representative s approval Description The nozzle kits are used to dir...

Page 3: ...diameter holes in each unit heater side panel to dimensions shown see drawing 3 Fasten L H Item 1 and R H Item 2 side panels to unit heater side panels with three 3 drill screws each using holes drilled in Step 2 above 4 Attach top panel Item 3 to nozzle side panels Items 1 2 with six 6 drill screws 5 Fasten top panel Item 3 to heater s upper trim panel utilizing existing screws at each end Then u...

Page 4: ...ening 4 Secure the bottom of the nozzle to the lower front trim panel of the unit heater by drilling through and using the screws provided 2 High Efficiency Power Vent Units 1 Remove the louvers and cone springs from the discharge end of the unit heater 2 Remove the screws from the upper front trim panel of the unit heater 3 Install the nozzle by securing the top panel of the nozzle to the face of...

Page 5: ...th three 3 drill screws each using holes drilled in Step 2 above 4 Attach top panel Item 3 to nozzle side panels Items 1 2 with six 6 drill screws 5 Fasten top panel Item 3 to heater s upper trim panel utilizing existing screws at each end Then using remaining holes as template drill through with 1 8 diameter drill and fasten with drill screws 6 Fasten second L H Item 1 and second R H Item 2 side ...

Page 6: ...ening 4 Secure the bottom of the nozzle to the lower front trim panel of the unit heater by drilling through and using the screws provided 2 High Efficiency Power Vent Units 1 Remove the louvers and cone springs from the discharge end of the unit heater 2 Remove the screws from the upper front trim panel of the unit heater 3 Install the nozzle by securing the top panel of the nozzle to the face of...

Page 7: ...RNING Disconnect the power source before installing this kit to prevent death or serious personal injury due to electrical shock For Use On Propeller and Blower Unit Heaters Natural or Power Vent Use directions for 90 nozzle kit assembly and installation Use directions for 90 nozzle kit assembly and installation Y Splitter Nozzle Kit 5 Way Blow Down Nozzle Kit Installation GPND IN 1 7 ...

Reviews: