background image

WARNING!

Disconnect the power source
before installing this kit to
prevent death or serious
personal injury due to
electrical shock.

For Use On Blower Unit
Heaters
Natural or Power Vent

WARNING!

Disconnect the power source
before installing this kit to
prevent death or serious
personal injury due to
electrical shock.

For Use On Propeller and
Blower Unit Heaters
Natural or Power Vent

Use directions for 90° nozzle kit
assembly and installation.

Use directions for 90° nozzle kit
assembly and installation.

Y-Splitter Nozzle Kit

5-Way Blow Down Nozzle Kit

Installation

GPND-IN-1

7

Summary of Contents for GBPD

Page 1: ...llation Sequence 1 Date August 1997 File No SV TD UH GPND IN 1 897 Supersedes New Installation GPND IN 1 Since the Company has a policy of continuous product improvement it reserves the right to change specifications and design without notice Models GAND GAPD GBND GBPD GCND GCPD GEND GEPD GHND GHPD GKND GKPD GPND GPPD Sizes 100 through 400 American Standard Inc 1997 ...

Page 2: ...nozzle kit be sure to confirm that the proper kit has been sipped If a thorough inspection of the kit reveals damage or material shortages file a claim with the carrier immediately Specify the extent and type of damage found and notify the appropriate Trane sales office Do not install a damaged nozzle kit without the Trane sales representative s approval Description The nozzle kits are used to dir...

Page 3: ...diameter holes in each unit heater side panel to dimensions shown see drawing 3 Fasten L H Item 1 and R H Item 2 side panels to unit heater side panels with three 3 drill screws each using holes drilled in Step 2 above 4 Attach top panel Item 3 to nozzle side panels Items 1 2 with six 6 drill screws 5 Fasten top panel Item 3 to heater s upper trim panel utilizing existing screws at each end Then u...

Page 4: ...ening 4 Secure the bottom of the nozzle to the lower front trim panel of the unit heater by drilling through and using the screws provided 2 High Efficiency Power Vent Units 1 Remove the louvers and cone springs from the discharge end of the unit heater 2 Remove the screws from the upper front trim panel of the unit heater 3 Install the nozzle by securing the top panel of the nozzle to the face of...

Page 5: ...th three 3 drill screws each using holes drilled in Step 2 above 4 Attach top panel Item 3 to nozzle side panels Items 1 2 with six 6 drill screws 5 Fasten top panel Item 3 to heater s upper trim panel utilizing existing screws at each end Then using remaining holes as template drill through with 1 8 diameter drill and fasten with drill screws 6 Fasten second L H Item 1 and second R H Item 2 side ...

Page 6: ...ening 4 Secure the bottom of the nozzle to the lower front trim panel of the unit heater by drilling through and using the screws provided 2 High Efficiency Power Vent Units 1 Remove the louvers and cone springs from the discharge end of the unit heater 2 Remove the screws from the upper front trim panel of the unit heater 3 Install the nozzle by securing the top panel of the nozzle to the face of...

Page 7: ...RNING Disconnect the power source before installing this kit to prevent death or serious personal injury due to electrical shock For Use On Propeller and Blower Unit Heaters Natural or Power Vent Use directions for 90 nozzle kit assembly and installation Use directions for 90 nozzle kit assembly and installation Y Splitter Nozzle Kit 5 Way Blow Down Nozzle Kit Installation GPND IN 1 7 ...

Reviews: