WARNING!
Disconnect the power source
before installing this kit to
prevent death or serious
personal injury due to
electrical shock.
For Use On Propeller and
Blower Unit Heaters
Natural or Power Vent
Kit Contents (Unassembled)
(2) L.H. Side Panels
(2) R.H. Side Panels
(1) 30° Top Panel
(1) 60° Top Panel
(1) Bottom Cross Brace
(1) Bag of #8 Drill Screws
The following steps for
assembling are recommended in
sequence:
1. Remove seven (7) horizontal
louvers and louver cone
springs from unit heater and
set aside. (Note louver and
spring positions).
2. Drill three (3) 1/8" diameter
holes in each unit heater “side
panel” to dimensions shown,
(see drawing).
3. Fasten L.H. (Item 1) and R.H.
(Item 2) side panels to unit
heater “side panels” with three
(3) drill screws each using
holes drilled in Step 2 above.
4. Attach “top panel” (Item 3) to
nozzle side panels (Items 1 &
2) with six (6) drill screws.
5. Fasten “top panel” (Item 3) to
heater’s “upper trim panel”
utilizing existing screws at
each end. Then, using
remaining holes as template,
drill through with 1/8" diameter
drill and fasten with drill
screws.
6. Fasten second L.H. (Item 1)
and second R.H. (Item 2) side
panels to first side panels
(Items 1 and 2) with three (3)
drill screws each.
7. Attach 60° “top panel° (Item 4)
to second nozzle side panels
(Items 1 and 2) with six (6)
drill screws.
8. Fasten rear horizontal flange
of top panel (Item 4) to front
horizontal flange of top panel
(Item 3) with drill screws.
9. Attach and fasten “bottom
cross brace” (Item 4) with two
(2) drill screws.
10.Install six (6) of the seven (7)
louvers and louver cone
springs removed from the unit
heater in Step 1.
Installation—60° Nozzle Kit
GPND-IN-1
5