WSHP-SVX014F-EN
29
Table 23.
Ducted filter opening size EXHF
Unit Size
A (in.)
B (in.)
C (in.)
EXH 006-015
21.1
15.4
5.4
EXH 018-030
24.5
18.4
5.6
EXH 036-042
26.4
19.4
5.5
EXH 048-070
30.7
21.4
5.5
Table 24.
Ducted filter opening size EXVG/DXVG
Unit Size
A (in.)
B (in.)
C (in.)
EXVG009-
012
19.0
16.25
6.6
EXVG015
20.5
17.25
6.6
EXVG018-
024,
DXVG024
23.5
18.25
6.6
EXVG030-
036,
DXVG036
30.0
20.25
6.6
EXVG042-
048,
DXVG048
30.0
27.0
6.6
EXVG060–
070,
DXVG060–
070
30.0
32.75
6.6
N
No
otte
e:: All dimensions in inches. EXVG/DXVG
dimensions are for accessory 2 or 4" Filter Rack.
Dual Filtration (DXH 2 to 6 tons)
(EXH 0.5 to 6 ton)
N
No
otte
e:: The dual-filtration design is typically used in a
free-return application.
The horizontal, DX and EXH model, allows the installer
flexibility in design applications such as a dual filtration
option. With the dual filtration design, the unit will
contain a lower static which translates into a decrease
in filter maintenance. For installation of a dual filtration
accessory for the DX and EXH model, verify that an
extra set of return-air filter racks and filter have been
ordered from the factory. This accessory will be
shipped separate from the unit, and should be located
in a separate box than the unit.
1. Remove the return-air side panel from the DXH and
EXH unit. This panel is held in place by screws.
2. Install the top/bottom filter rack at the new opening.
The 1/2 (25.4 mm/50.8 mm) adjustable filter rack is
held in place with four screws that once held the
panel.
3. Install the 1/2 (25.4 mm/50.8 mm) filter.
Sound Attenuation Pad
For sound-sensitive installations, a vibration pad (field
provided) should be placed beneath the horizontal or
vertical equipment. For the horizontal unit, the pad
should be approximately twice the size of the unit foot
print. For the vertical unit, the pad should be 0.5 in.
(12.7 mm) thick, and equal to the overall unit foot print.
Hanging the Horizontal Unit
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err S
Sttrru
uccttu
urra
all S
Su
up
pp
po
orrtt R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o e
en
nssu
urre
e p
prro
op
pe
err ssttrru
uccttu
urra
all cce
eiilliin
ng
g ssu
up
pp
po
orrtt
cco
ou
ulld
d rre
essu
ulltt iin
n u
un
niitt ffa
alllliin
ng
g ffrro
om
m iittss llo
occa
attiio
on
n w
wh
hiicch
h
cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
C
Ce
eiilliin
ng
g ssttrru
uccttu
urre
e m
mu
usstt b
be
e ssttrro
on
ng
g e
en
no
ou
ug
gh
h tto
o
ssu
up
pp
po
orrtt tth
he
e w
we
eiig
gh
htt o
off tth
he
e u
un
niitt a
an
nd
d a
an
ny
y
a
acccce
esssso
orriie
ess.. IIff u
un
nssu
urre
e,, cch
he
ecckk w
wiitth
h a
a ssttrru
uccttu
urra
all
e
en
ng
giin
ne
ee
err..
To hang the horizontal configuration (see the figure
below):
1. Install the hanging isolators (located in the return-
air section of the unit) into the four hanging
brackets.
2. Secure the equipment to a joist, concrete, etc. with
the use of 3/8 in. (9.7 mm) field provided (all-thread)
rod. Each corner should contain field provided nuts
and washers to complete the hanging installation.
3. Slope horizontal units in two directions. The unit
should contain a dual 0.25-12 pitch toward the drain
connection. This will insure proper drainage of the
unit. All plumbing to the unit should conform per
national and local codes and is the responsibility of
the contractor.
Figure 19.
Hanging the unit
SUPPLY-AIR
3/8" ALL-THREAD
(BY OTHERS)
3/8" WASHER / NUT
(BY OTHERS)
RETURN-AIR