TK 56702-1-OP-EN
89
Loading and Enroute Inspections
IIm
mp
po
orrtta
an
ntt:: Make sure cargo is pre-cooled to the proper temperature before
loading. The Thermo King unit is designed to maintain
temperature, not cool an above-temperature load.
1
5
2
RCS1117-2
3
4
1.
Inspect unit condenser grille openings to ensure they are free of debris.
2.
Inspect unit defrost drain tubes to ensure they are not plugged or kinked.
3.
Confirm there is sufficient fuel in tank to operate unit for time required for deliveries.
4.
Inspect the cargo box compartment inside and out for:
•
Inspect condition of door seals. They must seal tightly with no air leakage.
•
Damaged walls, missing insulation or blocked floor channels.
•
Inspect bulkheads (if applicable) for a air tight fit at ceiling, walls, and floor.
5.
Using the HMI Controller, turn the unit on to pre-cool cargo compartment:
•
Adjust setpoint to desired cargo temperature and allow unit to run a minimum of
30 to 60 minutes (longer if possible) before loading.
Important:
As product is being loaded, make sure evaporator air inlets and outlets are not
blocked. Maximum air circulation is necessary to properly maintain the
temperature of the entire load.