20
6).When the electronic scale displays the proper weight (refer to the gauge and the pressure of the low
side), disconnect the charge hose from the 3-way valve’s service port immediately and turn off the air
conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
6.6 Re-installation while the indoor unit need to be repaired
1. Collecting the refrigerant into the outdoor unit
Procedure
1). Confirm that both the 2-way and 3-way valves are set to the opened position
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5 seconds
and then close it quickly.
4). Set the 2-way valve to the close position.
Summary of Contents for TPG A128 IVP
Page 11: ...11 5 Wiring Diagram 5 1 Indoor Unit TPN A128 IVP TPN A135 IVP TPN A180 IVP TPN A240 IVP...
Page 12: ...12 5 2 Outdoor Unit TPGA128IVP TPG A135 IVP TPG A180 IVP...
Page 13: ...13 TPG A240 IVP...
Page 46: ...46 9 2 2 Indoor unit and outdoor unit communication protection error diagnosis and solution E1...
Page 50: ...50 9 2 7 Outdoor fan speed has been out of control diagnosis and solution F5...
Page 51: ...51 9 2 8 IPM malfunction or IGBT over strong current protection diagnosis and solution P0...
Page 52: ...52 9 2 9 Over voltage or too low voltage protection diagnosis and solution P1...
Page 53: ...53 9 2 10 Inverter compressor drive error diagnosis and solution P4...