19
6).When the electronic scale displays the proper weight (refer to the table), disconnect the charge hose
from the 3-way valve’s service port immediately and turn off the air conditioner before disconnecting the
hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
6.5 Adding the refrigerant after running the system for many years
Procedure:
1). Connect the charge hose to the 3-way service port, open the 2-way valve and the 3-way valve.
Connect the charge hose to the valve at the bottom of the cylinder. If the refrigerant is R410A, make
the cylinder bottom up to ensure liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
Electronic scale
Summary of Contents for TPG A128 IVP
Page 11: ...11 5 Wiring Diagram 5 1 Indoor Unit TPN A128 IVP TPN A135 IVP TPN A180 IVP TPN A240 IVP...
Page 12: ...12 5 2 Outdoor Unit TPGA128IVP TPG A135 IVP TPG A180 IVP...
Page 13: ...13 TPG A240 IVP...
Page 46: ...46 9 2 2 Indoor unit and outdoor unit communication protection error diagnosis and solution E1...
Page 50: ...50 9 2 7 Outdoor fan speed has been out of control diagnosis and solution F5...
Page 51: ...51 9 2 8 IPM malfunction or IGBT over strong current protection diagnosis and solution P0...
Page 52: ...52 9 2 9 Over voltage or too low voltage protection diagnosis and solution P1...
Page 53: ...53 9 2 10 Inverter compressor drive error diagnosis and solution P4...