18
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
∙
m.
Be sure to check the gas leakage.
3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of
the cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure the liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
Electronic scale
Summary of Contents for TPG A128 IVP
Page 11: ...11 5 Wiring Diagram 5 1 Indoor Unit TPN A128 IVP TPN A135 IVP TPN A180 IVP TPN A240 IVP...
Page 12: ...12 5 2 Outdoor Unit TPGA128IVP TPG A135 IVP TPG A180 IVP...
Page 13: ...13 TPG A240 IVP...
Page 46: ...46 9 2 2 Indoor unit and outdoor unit communication protection error diagnosis and solution E1...
Page 50: ...50 9 2 7 Outdoor fan speed has been out of control diagnosis and solution F5...
Page 51: ...51 9 2 8 IPM malfunction or IGBT over strong current protection diagnosis and solution P0...
Page 52: ...52 9 2 9 Over voltage or too low voltage protection diagnosis and solution P1...
Page 53: ...53 9 2 10 Inverter compressor drive error diagnosis and solution P4...