– 59 –
9
TEST OPERATION
Check and Test operation
Be sure to test the piping connections for gas leak.
• Check the flare nut connections, valve stem cap
connections and service port cap connections for
gas leak with a leak detector or soap water.
Test operation
• To test the system, push and hold RESET button for
10 sec. (There will be one short beep.)
• Service port
cap connection
• Valve stem
cap connection
Flare nut
connections
(Outdoor unit)
Flare nut
connections
(Indoor unit)
10
INSTALLATION / SERVICING TOOLS
Tools
Tools
Gauge manifold
Charge hose
Electronic balance for
refrigerant charging
Torque wrench
(nominal diam. 1/2, 5/8)
Tools
Flare tool (clutch type)
Gauge for projection
adjustment
Vacuum pump adapter
Gas leakage detector
Applicable to R22 model
o
o
¡
o
¡
: Newly prepared (They are special requirements for R410A, separated from those for R22.)
o
: Existing tools are available.
For the details of the tools, refer to the Installation manual of the outdoor unit.
Applicable to R22 model
¡
__
____
¡
o
Summary of Contents for RAS-M10SMUCV-E
Page 71: ... 71 11 7 P C Board Layout ...