– 51 –
Thermal insulating process
• After checking the draining, wrap the supplied thermal insulation material for the drain connecting part around the
flexible hose leaving no clearance from the root of the drain pipe connecting port of the indoor unit.
• Wrap the thermal insulation material (procured locally) around the drain pipe so that it piles up on the supplied
the thermal insulation material for the drain connecting part, leaving no clearance.
CAUTION
Ensure water is poured slowly.
If water is poured vigorously, it is scattered inside of
the indoor unit resulting in a cause of unit trouble.
Flexible hose
Hose band
Attached heat insulator Heat insulator to be
procured locally
Hard vinyl chloride pipe
Water (1500cc to 2000cc)
Insert the leading part of the
hose between the heat
exchanger and the drain pan,
and then bend it downward.
Check panel
Polyethylene hand pump for
pouring water in drain pan
Vessel
Drain pan
Air
discharge area
4
DRAIN PIPING WORK
Summary of Contents for RAS-M10SMUCV-E
Page 71: ... 71 11 7 P C Board Layout ...