3 Tests and Diagnostics
3.5 Memory Test
Libretto 50CT/70CT Maintenance Manual
3-11
Subtest 05
Memory module
NOTE:
To execute this subtest, an optional memory card must be
installed in the computer.
This subtest functions the same as subtest 04, except it is used for testing an
optional memory card. Memory module capacity is 8 MB or 16 MB.
After selecting subtest 05, the following message displays:
Extended memory size
(1:8 MB,2:16 MB)?
Select the number that corresponds to the memory card installed in the
computer.
Subtest 06
Cache memory
To test the cache memory, a pass-through write-read comparison of ‘5A’ data
is run repeatedly to the test area (‘7000’:’Program’ size to ‘7000’:’7FFF’ (32
KB)) to check the hit-miss ratio (on/off status) for CPU cache memory. One
test takes 3 seconds.
Number of misses
<
Number of hits
→
OK
Number of misses
≥
Number of hits
→
Fail
Summary of Contents for Libretto 50CT
Page 8: ...viii Libretto 50CT 70CT Maintenance Manual ...
Page 10: ...Chapter 1 Hardware Overview ...
Page 11: ...1 ii Libretto 50CT 70CT Maintenance Manual ...
Page 30: ...Chapter 2 Troubleshooting Procedures ...
Page 31: ...2 ii Libretto 50CT 70CT Maintenance Manual ...
Page 61: ...Chapter 3 Tests and Diagnostics ...
Page 62: ...3 ii Libretto 50CT 70CT Maintenance Manual ...
Page 64: ...3 iv Libretto 50CT 70CT Maintenance Manual 3 22 2 Operations 3 45 ...
Page 128: ...Chapter 4 Replacement Procedures ...
Page 129: ...4 ii Libretto 50CT 70CT Maintenance Manual ...
Page 167: ...Appendices ...
Page 168: ...App ii Libretto 50CT 70CT Maintenance Manual ...
Page 178: ...Appendix B Board Layout B 4 Libretto 50CT 70CT Maintenance Manual ...
Page 183: ...Appendix C Pin Assignments Libretto 50CT 70CT Maintenance Manual C 5 ...
Page 186: ...Appendix Appendix C Pin Assignments C 8 Libretto 50CT 70CT Maintenance Manual 43 GND 44 NC ...
Page 194: ...Appendix F BIOS Rewrite Procedures F 2 Libretto 50CT 70CT Maintenance Manual ...
Page 196: ...Appendix G Reliability G 2 Libretto 50CT 70CT Maintenance Manual ...