High-Wall Type
Installation Manual
– 36 –
Toshiba
EN
▼
In case of wireless remote controller (Forced
test operation is performed in a different
way.)
REQUIREMENT
• For the operation procedure, be sure to follow
the Owner’s Manual.
• Finish the forced cooling operation in a short
time because it applies excessive strength to
the air conditioner.
• A test operation of forced heating is
unavailable. Perform a test operation by heating
operation using the wireless remote controller.
However heating operation may be not carried
out according to the temperature conditions.
• Check wiring/piping of indoor and outdoor
units
1. When pushing
button for 10 seconds or
more, “Pi!” sound is heard and the
operation changes to a forced cooling
operation. After approx. 3 minutes, a
cooling operation starts forcedly.
Check cool air starts blowing. If the
operation does not start, check wiring
again.
2. To stop a test operation, push
button
once again (Approx. 1 second).
The louver closes and the operation stops.
• Check transmission of remote controller
1. Push “
” button of the remote controller to
check an operation can also start by the
remote controller.
• “Cooling” operation by the remote
controller may be unavailable according
to the temperature conditions.
Check wiring/piping of the indoor and
outdoor units in forced cooling operation.
36-EN
+001111052201_00Ta.book Page 36 Friday, November 20, 2009 11:45 AM
Summary of Contents for Carrier RAV-SP180KRT-UL
Page 86: ......
Page 87: ......
Page 88: ...1111052201 Toshiba 001111052201_00Ta book Page 87 Friday November 20 2009 11 45 AM ...