3. Database Management
14
The specification of report data is as follows:
Table 3.2 Specification of Report Data
Item
Specification
Data that can be collected
PCS process tags
Internal OIS process tags
Operator set values
Collection Period
One minute
Collection Points
5,000 tags/system, total with historical tags
Save Period
Hourly data
Bimonthly, quarterly and every 4 months
Daily data
Bimonthly, quarterly and every 4 months
Monthly data
Every 2, 3 and 4 years
Yearly data
Every 2, 3 and 4 years
Report-Calculations of Collected Data
Instantaneous, maximum, minimum and average
values. Maximum-value time, minimum-value time,
and integrated values (Counters, operation hours
and analog integration)
Summary of Contents for 6F8C0791
Page 1: ...SVR DS System Function Manual 6F8C0791 Toshiba Integrated Control System MENU ...
Page 10: ...Safety Precautions viii ...
Page 22: ...2 Tag Management 8 ...
Page 48: ...4 Background Processing 34 ...
Page 52: ...6 Time Monitoring 38 ...
Page 56: ...8 SVR Engineering 42 ...
Page 62: ...Appendix1 System Specification Of OIS DS SVR DS 48 ...
Page 63: ......