Safety Precautions
ii
Confirmation of product safety label
Confirm that product safety labes are put on the front panel of the power supply module. If
the lavel is lost or soiled, inform TOSHIBA Corporation.
1. Safety Precautions for Installation
WARNING
Grounding required:
To avoid the risk of electric shock or fire, be sure to ground the equipment.
CAUTION
Choose proper environment for installation:
Avoid installing and storing the equipment in the following environments:
l
Location with considerable dust
l
Location in which flammable or corrosive gases (such as SO
2
and H
2
S) are present
l
Location where vibration or shock exceeds allowable limits
l
Location where condensation may occur due to rapid change in temperature
l
Location where the temperature is not within the specified range for installation
l
Location where the humidity exceeds the specified limits for installation
l
Location in the direct sunlight
l
Location near a device that generates strong radio waves or magnetic fields
Considerations for maintenance and inspection:
Install the equipment in a place that facilitates maintenance and inspection. If not, in case of
malfunctioning, it may hinder the recovery of the system and result in serious accident.
Ensure proper ventilation:
Do not block vents, intake or exhaust openings of the equipment. Blocking them may cause
mulfunctioning or overheating which may result in fire.
Prohibit excessive voltage or current:
Avoid applying excessive voltage and current across the input/output terminals by keeping them
within the specified ratings. Otherwise it may result in equipment damage.
Avoid noise interference:
Place I/O and data transmission signal cables away from the power cables and the devices that
generate magnetic or electromagnetic fields. Interference noise may cause the equipment to
malfunction.
Summary of Contents for 6F8C0791
Page 1: ...SVR DS System Function Manual 6F8C0791 Toshiba Integrated Control System MENU ...
Page 10: ...Safety Precautions viii ...
Page 22: ...2 Tag Management 8 ...
Page 48: ...4 Background Processing 34 ...
Page 52: ...6 Time Monitoring 38 ...
Page 56: ...8 SVR Engineering 42 ...
Page 62: ...Appendix1 System Specification Of OIS DS SVR DS 48 ...
Page 63: ......