9
4400 Series Installation and Operation Manual – 64527-008
Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are shrink wrapped.
1. Remove shrink wrap.
2. Unbolt the rails from
both the unit and the
shipping pallet.
3. Place the rails on the
front of the pallet.
4. Attach the rails as shown to the front of
the pallet.
5 Use the four 1/2 x 3” bolts to secure the
rails to the shipping pallet.
6. Place the tie brackets in the slots at the
upper and lower ends of the ramps.
7 SLOWLY roll the unit down the ramp.
8. Save the loading rails for anchoring of
the UPS. See Section 8.3.
FIGURE 4.1: UNSHIPPING 15-30KVA UPS
Summary of Contents for 4400 Series
Page 2: ......
Page 6: ...This page left intentionally blank ...
Page 10: ...This page left intentionally blank ...
Page 136: ...This page left intentionally blank ...
Page 137: ......