Maintaining the Chassis
Checking the Machine for
Loose Hardware
Service Interval:
Before each use or daily
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page 51)
.
2.
Visually inspect machine for damaged or worn
parts, and check for loose hardware.
Note:
Before operating the machine, replace
any damaged parts and tighten all loose
hardware.
Maintaining the Sprayer
and Spreader Systems
Checking the Sprayer
System
Service Interval:
Every 50 hours
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page 51)
.
2.
Check all hoses, nozzles, and fittings for
damage and leaks.
Note:
Replace all damaged or leaking sprayer
components.
3.
Check the nozzle strainers and in-line strainers
for accumulation of dirt and chemical sludge.
Note:
Clean or replace strainers with an
accumulation of dirt and chemical sludge.
Checking the Spreader
System
Service Interval:
Every 50 hours
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page 51)
.
2.
Spray the hopper cables, accuway cable, and
the deflector-shield cable with silicone spray, if
needed.
3.
Clean the bottom of the hopper with a wire brush
and clean off any fertilizer, if needed.
4.
Replace the hopper bottom bushing or the
impeller, if needed.
73
Summary of Contents for Spray Master
Page 48: ...g313490 Figure 60 52 inch machine shown 1 Rear tie down points 48...
Page 84: ...g317991 Machine Model 34237 Electrical Schematic 135 6146 Rev B 84...
Page 85: ...Notes...
Page 86: ...Notes...
Page 87: ...Notes...
Page 88: ......