Media and Additional Parts
Description
Qty.
Use
Operator's Manual
1
Read before operating the aerator
Parts Catalog
1
Use to reference part numbers
Spring Wires - SR48
4
Replacement spring wires
Spring Wires - SR48
2
Replacement spring wires
Spring Wires - SR54 & SR54-S
6
Replacement spring wires
Spring Wires - SR70 & SR70-S
8
Replacement spring wires
Spring Wires - SR72
4
Replacement spring wires
Spring Wires - SR72
2
Replacement spring wires
Spring Wires - SR75
4
Replacement spring wires
Spring Wires - SR75
2
Replacement spring wires
Operator training materials
1
View before operating the aerator
PTO Operators Manual
1
Read before operating the aerator
1
Removing the Aerator from
the Crating
No Parts Required
Procedure
1. Remove the aerator from the crating.
2. Remove the bolts securing the aerator storage stands
to the shipping pallet and remove the aerator from
the pallet.
3. Remove the storage stands from the aerator. Retain
them for storage use.
Note:
The SR54-S and the SR70-S do not have
shipping stands.
4. Place the aerator on a flat, level surface with the
front roller on the ground and a 2 x 4 positioned
under the heads.
2
Connecting the Lower Link
Arms
Parts needed for this procedure:
2
Hitch pin
2
Lynch pin
Procedure
1. Back the tractor squarely up to the aerator until
the lower link arms are aligned with the mounting
brackets.
Note:
The aerator gear box shaft should be in line
with the tractor PTO shaft (centered on the tractor).
If they are not in line, adjust the lower link arms,
from side to side until the shafts are aligned.
2. Make sure the PTO is disengaged.
3. Engage the parking brake, STOP the engine and
remove the key from the ignition. Wait for the
engine and all moving parts to STOP before leaving
the Operator's seat on the tractor.
Note:
For maximum ground clearance, the hitch
pins should be secured in the aerator lower mounting
bracket holes, when so equipped. To determine
9