
35
Most common timers for the transfer switch control can be configured here. Note that any timer set to 0 will remove
the delay in the decision process.
Access level 1:
- Cooling Time: Time delay after which a running generator can be shut down when all running causes have return
to normal.
- Retransfer time: Time delay used to re-qualify the normal power and retransfer. Typically five minutes.
Voltage Calibration
Config > Advanced > Voltage
To calibrate the voltage sensing element of a power source, enter the 3 phase voltages as read on a calibrated
meter then press compute. In the case of a transfer switch model, 3 additional voltages need to be calibrated the
same way.
Current Calibration
Config > Advanced > Current
To calibrate a particular current sensing element, enter the current value as read from a calibrated ammeter and
then press COMPUTE. For best results, press the ZERO button when no current is flowing through the sensing
element before calibrating.
Summary of Contents for GPU
Page 20: ...20 The First Start up is now completed The controller is fully installed and configured ...
Page 45: ...45 The Sensors Pages ...
Page 52: ...52 ...
Page 67: ...67 ...