
18
The "First Setup" page replaces the Homepage until the "First Setup" is done. Proceed to the setup page and press
the lock to enter your authorization code.
Select the controller pressure units, cut-in and cut-out. Verify that all other parameters on the setup page are
correct.
When satisfied with the controller settings, press the
“Home” button on the membrane, then acknowledge the
changes by pressing the "Done" button. If the "Done" button is unavailable, ensure that a sufficient authorization
code has been entered and that at least all three voltages are valid.
Summary of Contents for GPU
Page 20: ...20 The First Start up is now completed The controller is fully installed and configured ...
Page 45: ...45 The Sensors Pages ...
Page 52: ...52 ...
Page 67: ...67 ...