![Toptech MultiLoad II DIV-2 Installation Manual Download Page 45](http://html1.mh-extra.com/html/toptech/multiload-ii-div-2/multiload-ii-div-2_installation-manual_1129916045.webp)
36
MultiLoad II Flow Meter and Control Valve Wiring
5.4.1
L
N
15A
L
N
L
N
VCC
A
B
GND
B
A
I/O DIGITAL/
ANALOG
I/O 2 METER
METER 0
METER 1
PORT 2
PORT 5
PORT 4
&
PORT 3.IN/
PORT 3.OUT
PORT 2.OUT
LINE.IN
PORT 2.IN/
LINE.IN
PORT 3
+
-
A
0°
+
-
B
90°
+
-
5V
12V
PORT 4.+
IN
10
OUT 9
IN
8
OUT 7
IN
6
OUT 5
IN
4
OUT 3
IN
2
OUT 1
PORT 2
PORT 3
IO_DA TB1
PORT 0
PORT 1
PORT 8
PORT 0
OUT 5
PORT 1
OUT 4
PORT 2
OUT 3
PORT 3
OUT 2
LINE
IN
1
IO_2M TB3
PORT 0
OUT 5
PORT 1
OUT 4
PORT 2
OUT 3
PORT 3
OUT 2
LINE
IN
1
IO_2M TB2
+
1
-
2
+
3
(
)
-
4
(
)
+
5
-
6
+
7
-
8
+
9
-
10
IO_DA TB2B
PORT 4
PORT 5
PORT 6
PORT 7
PORT 9
+
1
+
2
+
3
+
4
+
5
-
6
-
7
-
8
-
9
-
10
IO_DA TB2A
12Vdc
+
1
-
2
+
3
(
)
-
4
(
)
+
5
-
6
IO_2M TB7
PORT 4
PORT 5
PORT 7
+
1
+
2
-
3
-
4
12Vdc
IO_2M TB6
+
1
-
2
+
3
(
)
-
4
(
)
+
5
-
6
IO_2M TB8
PORT 4
PORT 5
PORT 7
+
1
+
2
-
3
-
4
12Vdc
IO_2M TB6
PORT 4.-
PORT 5.+
PORT 5.-
Caution:
Line voltage used to drive the Digital Valve Solenoids MUST be controlled by the Ground or Overfill monitor. In the event of a Ground loss or
Overfill detection, this voltage must be switched off to ensure a failsafe shutdown of the product flow.
Summary of Contents for MultiLoad II DIV-2
Page 1: ...MultiLoad II RCU II DIVISION 2 DIV2 Installation Guide Part 6074...
Page 7: ...Hardware Revision 80 9 1 Manual Revision 81 9 2...
Page 20: ...11 2 1 2 4 Side View Figure 2 6 Unit Outline Drawing Side View...
Page 25: ...16 Figure 3 1 Suggested Mounting Position Figure 3 2 Screen Visible Area...
Page 59: ...50 Typical 1 Meter Application Wiring Example IP E Drawing Electrical Wiring Schedule 5 4 14...
Page 64: ...55...
Page 73: ...64...
Page 88: ...79 Chapter8 HardwareRevisionHistory Compatibility Chapter 8...