Grading Applications
Motorgrader System Five Operator’s Manual
5-24
Once grade has been cut and verified at the centerline, mark the
centerline with spray paint to make it visible for the operator.
Figure 5-31.
Finished grade can be carried over the centerline by tracking the pass
on the opposite side.
Figure 5-32.
C
L
2.0%
SLOPE
2.0%
SLOPE
MARK CENTERLINE
WITH SPRAY CAN
SPRAY PAINT
CENTERLINE
AT 25' INTERVALS
WINDROW PUSHED
1 1/2' OR MORE
PAST CENTERLINE
VIEW F ROM BEHIND G RADER
2.0%
SLOPE
C
L
Summary of Contents for Motorgrader
Page 1: ...OTORGRADER 3YSTEM IVE4 ONTROL OX PERATORlS ANUAL...
Page 2: ......
Page 4: ...ECO 2955...
Page 8: ...Table of Contents Motorgrader System Five Operator s Manual Notes iv...
Page 22: ...System Overview Motorgrader System Five Operator s Manual Notes 1 12...
Page 58: ...Operation Motorgrader System Five Operator s Manual Notes 2 36...
Page 168: ...Safety Information Motorgrader System Five Operator s Manual Notes A 4...
Page 171: ......