2
Machine should be installed in the place of no obvious source of shock, they can be
these concrete foundations. Machine surrounded should have adequate space and is
easy to install, debug and maintenance operations. Level on the jaw of the middle
position of the bed, see figure 2, along the vertical and horizontal adjustment band
sawing machine legs below the plane mattresses (customers to purchase) or Pad.
When the band sawing machine in level, sure to tighten bolts, see figure 2.
Figure 2 Forklift removal
Ⅳ
Main Structure
Base intracavity has more space, behind left is the Hydraulic Power Unit, and behind
right is the Power Supply Control Board. Hydraulic Pressure Oil Tank is on front left,
Coolant Box on front right. Lathe Bed and Bearing fixed at the base, the bed was
loaded with jaw, clamping screw and slip piece with the left Clamping Tank and
Handle Wheel. When Screw rotat the left jaw 10-25mm by the work piece, push tight
loose button to tight or unfasten work piece. Behind lean is be loaded with feeding
board, front leans be loaded with access material Board. Saw beams rotates around
the bearing with tension block and idler band wheel on the left; Worm box to its right.
The motor behind Worm box drives the worm and wheel which inside the worm box
Anchor Bolt
A-A