PWi Forging User’s Manual
Doc #17663 Rev A Page
Toledo Integrated Systems
16
Load Sensor Connection
Refer to Figure 1.8 for the procedures below to connect tonnage sensors properly:
1)
Power down the unit. Open the door of the PWi Forging enclosure.
2)
Run Load Sensor cables through Conduit Hole #1 (see Figure 1.4), and route cables upward to
the Analog Board.
3)
Prepare the sensor cable for termination as described on page 17.
4)
Remove the four 5-pin Phoenix plugs from the analog board and wire each sensor cable as
described on page 18.
5)
The 5-pin phoenix plugs can then be inserted into the corresponding sockets. The load sensor
cable connections are now complete.
Analog Board
Channel 1
Left Rear Sensor
Channel 2
Right Rear Sensor
Channel 3
Left Front Sensor
Channel 4
Right Front Sensor
Figure 1.8: Sensor Input Locations
Summary of Contents for PWi Forging
Page 1: ...17664 PWi Forging Tonnage Monitor By Toledo Integrated Systems User s Manual...
Page 2: ......
Page 28: ...PWi Forging User s Manual Doc 17663 Rev A Page Toledo Integrated Systems 26...
Page 74: ...PWi Forging User s Manual Doc 17663 Rev A Page Toledo Integrated Systems 72...
Page 78: ...PWi Forging User s Manual Doc 17663 Rev A Page Toledo Integrated Systems 76...
Page 80: ......
Page 82: ...Doc 11080 Rev A T400 INSTALLATION PAGE 2...
Page 83: ...Doc 11080 Rev A T400 INSTALLATION PAGE 3...
Page 84: ...Doc 11080 Rev A T400 INSTALLATION PAGE 4...
Page 87: ...Doc 11080 Rev A T400 INSTALLATION PAGE 7...
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......