172-65639M-01 (EF200) 13 Apr 2018
42
7. Commissioning
7.1 Function Check
Make sure that all final checks regarding installation and wiring have been
completed before you commission the device.
7.2 Commissioning
7.2.1 Switching on the Measuring Device
Once the function checks have been successfully completed, it is time to
switch on the supply voltage. After 5 to 10 seconds, the device is ready for
operation. The measuring device performs a number of internal test functions
after power-on. As this procedure progresses, the following message appears
on the local display:
Start-up message:
Displays the current software version
Normal measuring mode commences as soon as start-up completes. Various
measured values and/or status variables appear on the display (HOME position).
Note!
If start-up fails, an appropriate error message is displayed, depending on the
cause.
7.2.2 Device Setup
The Setup menu contains all parameters required for standard operation.
The following parameters should be configured at startup time.
Parameter
Menu
Contents
See
System units
“Setup” menu
→
Advanced setup
→
System units
Configure units for all parameters
8.2.11
Medium selection “Setup” menu
→
Medium selection
Select the medium to be
measured and configure settings
for related parameters.
8.2.5
Current output
“Setup” menu
→
Current output 1 to 2
Configure assignment and
parameters of current output.
8.2.6
Pulse/frequency/
switch output
“Setup” menu
→
Pulse/frequency/
switch output
Configure assignment and
parameters of
pulse/frequency/switch output
8.2.7
Display
“Setup” menu
→
Display
Configure display settings
8.2.8
Totalizer
“Setup” menu
→
Advanced setup
→
Totalizer 1 to 3
Configure assignment and
parameters of totalizer
8.2.16
NOTE:
•
TLV will preconfigure the parameters necessary for measurement
after determining the customer’s specification.
•
See 4.3 for more information when using EF200 in combination with
TLV EC351 Flow Computer.
Note!
Note!