10. Continue to lift the cabinet until the lower mounting slots are free of the 2 lower bolts.

11. Pack the equipment carefully in the original packaging, free from condensation and dust, and return it

to TKH Airport Solutions. If the original packaging is not available, please contact TKH Airport Solutions
Customer Service for instructions.

12. If you need to install a new CEDD

®

 HPS Basestation, go to Installation Instructions on page 20.

Installation and Maintenance Manual  -  CEDD

®

 HPS Basestation

©

TKH Airport Solutions 2022. All rights reserved. All specifications subject to change without notice.

31

Summary of Contents for CEDD

Page 1: ...HPS Basestation Installation and Maintenance Manual CEDD AGL System Airfield Ground Lighting 03 70092 V2 0...

Page 2: ...or USE System Engineering Holding B V or their affiliated companies include the following The specified product information herein and all related data and information are proprietary and confidential...

Page 3: ...13 3 2 3 CEDD HPS Basestation Components 14 3 3 Specifications 14 4 Inspection 15 4 1 Inspect the Transport Box 15 4 2 Inspect the Contents of the Transport Box 15 4 3 Visually Inspect the CEDD HPS Ba...

Page 4: ...placing a CEDD HPS Basestation 28 8 Troubleshooting 32 9 Taking Out of Service 33 9 1 Disposal 33 4 Installation and Maintenance Manual CEDD HPS Basestation TKH Airport Solutions 2022 All rights reser...

Page 5: ...nce Manual is a part of your product Store the manual in a location that can be easily accessed by personnel working on the product It is the responsibility of the company operating this equipment to...

Page 6: ...tions and safety guidelines in this manual The safety of any system incorporating the HPS Basestation is the responsibility of any site installation commissioning maintenance and operational personnel...

Page 7: ...rport Solutions Customer Service department service tkh airportsolutions com 1 8 Document Information Name 05_CEDD_HPS_Basestation_Installation_and_Maintenance_Manual_03 70092 Version V2 0 Language En...

Page 8: ...alling operating or maintaining this equipment to ensure that its personnel meet these requirements 2 2 Intended Use The CEDD HPS Basestation is designed and intended only for the purpose of Airfield...

Page 9: ...ing of system components and their operation will help you to operate the system safetly and efficiently Do not deactivate or bypass automatic safety interlocks or locked out electrical disconnects Pr...

Page 10: ...products Verify that the moving equipment is rated to handle the weight When loading or unloading ensure that the products are carefully balanced and secured using a safety strap No more than 6 packag...

Page 11: ...lose to your body while moving Keep the CEDD HPS Basestation at a reasonable height so you can see where you are going 2 7 Installation and Maintenance Read the safety instructions in Chapter 5 Instal...

Page 12: ...es and the fixtures send information about their status back to the CEDD HPS Basestation Each fixture is connected to the CEDD cable without galvanic contact HPS means High Power System The CEDD HPS B...

Page 13: ...s Outer dimensions Pos Description Values 1 Width 480 mm 2 Height 545 mm 3 Depth 193 mm 4 Horizontal screw hole distance 430 mm 5 Vertical screw hole distance 500 mm Installation and Maintenance Manua...

Page 14: ...in Logic AC mains in 3 LAN 4 CEDD Power out Make sure the labels are always legible Replace labels if they are damaged or illegible 3 3 Specifications Refer to the datasheet to read the specification...

Page 15: ...ning W rth Logic mains in connector 691340400003 Phoenix Contact Power AC mains in connector PC 5 3 GF 7 62 Art No 1720806 Weidm ller CEDD power out connector 1813580000 3 pin A zip bag containing Saf...

Page 16: ...itions Allow ample room for maintenance panel accessibility and cover removal Protect equipment with safety devices as specified by applicable safety regulations If safety devices must be removed for...

Page 17: ...re that the CEDD HPS Basestation is properly connected to the protective earth before connecting mains power The CEDD HPS Basestation is a system with a high touch current It is highly recommended to...

Page 18: ...kers must have a nominal current of 16 A and be type B according to IEC 60898 The use of a disconnecting device is mandatory This device has to simultaneously switch and isolate the Power AC mains in...

Page 19: ...l constructive profiles leaving the space minimum 80 mm between the cabinet and the wall at the top and bottom open for airflow The cabinet should not be mounted on horizontal profiles which would red...

Page 20: ...needed Open ended wrench 10 mm Metric tap set 6 mm Drill with drill bit 5 mm The example below is a guide to mounting the CEDD HPS Basestation on a metal structure Other support structures may require...

Page 21: ...moothly onto the lower bolts 5 Place the upper mounting slots over the highest bolts and carefully lower the CEDD HPS Basestation onto the four bolts 6 Fasten the four supporting bolts use a wrench to...

Page 22: ...aterials necessary to connect the Protective Earth to the CEDD HPS Basestation are not included in the connector kit The following tools are needed Phillips PH2 screwdriver Pozidriv PZ2 screwdriver sl...

Page 23: ...cabinet to the protective earth using an M4 7 mm hex socket tightened to 2 Nm with a ratcheting socket wrench or equivalent 1 M4 serrated lock washer 2 M4 ring tongue terminal with earth cable 4 mm 2...

Page 24: ...Plug in and hand tighten the Power AC mains in A and Logic AC mains in B connectors to the CEDD HPS Basestation Tighten the 2 connector flange screws using a slotted SL3 screwdriver Do not plug anyth...

Page 25: ...CEDD HPS Basestation to lock the cable connector 8 Remount the bottom panel Attach the protective earth wire 1 and mount the bottom panel by fastening the two screws at the front 2 using a Phillips P...

Page 26: ...D AGL LED fixtures cannot be controlled directly after installation In order to work properly the CEDD HPS Basestation must first be configured The configuration can be installed locally on 1 CEDD HPS...

Page 27: ...fluid be allowed to enter the CEDD HPS Basestation To clean the outside of the CEDD HPS Basestation 1 Remove any dirt on the cabinet with a soft moist cloth If necessary add a mild detergent water an...

Page 28: ...are needed Phillips PH2 screwdriver Slotted SL3 screwdriver Ratcheting socket wrench or equivalent with M4 7 mm hex socket Open ended wrench 10 mm Perform the following steps to replace a CEDD HPS Ba...

Page 29: ...onnector from the CEDD HPS Basestation Power AC Mains In Logic AC Mains In LAN1 LAN2 CEDD Power out 5 Disconnect the protective earth of the cabinet using an M4 7 mm hex socket with a ratcheting socke...

Page 30: ...3 M4 plain washer 4 M4 self locking nut 8 Remount the bottom panel by fastening two screws at the front using a Philips PH2 screwdriver 9 Slide the CEDD HPS Basestation upwards and carefully pull the...

Page 31: ...t to TKH Airport Solutions If the original packaging is not available please contact TKH Airport Solutions Customer Service for instructions 12 If you need to install a new CEDD HPS Basestation go to...

Page 32: ...e front panel display is illuminated If not refer to failure 1 If illuminated check whether the cooling fans are running wait 30 seconds after turning on the device Make sure that the Power AC mains a...

Page 33: ...r or disposal Contact TKH Airport Solutions Customer Service for the correct address 9 1 Disposal All electrical and electronic products must be disposed of separately from normal waste at the end of...

Page 34: ...on of pioneering developments in the AGL and connectivity industry Being part of the TKH Group our company can build on a history of more than 90 years in smart connectivity energy distribution and AG...

Reviews: