5.3 Installation Instructions
5.3.1 Wall-mounting Instructions
•
The suspension materials and the structure supporting the CEDD
®
HPS Basestation
must be capable of supporting a weight of 80 kg.
•
Ensure that the structure supporting the CEDD
®
HPS Basestation provides adequate
strain reliefs for all the connected cables. These are typically mounted on a mounting
plate below the cabinet.
•
The rigidity of the support structure must meet the requirements of the electrical
safety standard IEC 61010-1 and applicable local regulations.
Ensure that all mounting materials are appropriate for the weight of the CEDD
®
HPS
Basestation and the material that it is mounted on.
The following tools are needed:
•
Open ended wrench 10 mm
•
Metric tap set 6 mm
•
Drill with drill bit 5 mm
The example below is a guide to mounting the CEDD
®
HPS Basestation on a metal
structure. Other support structures may require different actions and materials.
1.
Drill four holes at the distances specified in Dimensions on page 13 and tap the holes using M6 taps.
Make sure you apply the clearances required for adequate airflow; see Wall-mounting Clearances.
2.
Drill holes for attaching the strain reliefs of all the connecting cables. The strain reliefs should be
mounted as close as possible to the CEDD
®
HPS Basestation.
Center-to-center distances
mm
Function
A
77
Power AC mains in
B
137
Logic AC mains in
C
349
LAN 1
D
369
LAN 2
E
449
CEDD
®
Power out
20
Installation and Maintenance Manual - CEDD
®
HPS Basestation
©
TKH Airport Solutions 2022. All rights reserved. All specifications subject to change without notice.