3.
Connect Power AC mains in (A) and Logic AC mains in (B) wires to the cable connectors and
tighten using a slotted SL3 screwdriver.
A
Power AC
mains in
Pin 1 - L(ine)
Pin 2 - N(eutral)
Pin 3 - Protective
earth
In the drawing:
brown
blue
green-yellow
B
Logic AC
mains in
Pin 1 - L(ine)
Pin 2 - N(eutral)
Pin 3 - Protective
earth
In the drawing:
brown
blue
green-yellow
4.
Plug in and hand-tighten the Power AC mains in (A) and Logic AC mains in (B) connectors to the
CEDD
®
HPS Basestation. Tighten the 2 connector flange screws using a slotted SL3 screwdriver.
Do not plug anything into the service connectors (marked with a red cross).
5.
Connect the RJ45 connectors of the STP cables to the LAN ports LAN1 (C) and/or LAN2 (D).
C
LAN 1
RJ45 connector
D
LAN 2
RJ45 connector
24
Installation and Maintenance Manual - CEDD
®
HPS Basestation
©
TKH Airport Solutions 2022. All rights reserved. All specifications subject to change without notice.