Route the loose tubes to the back of the splice tray holder
in a bow as shown in the figure. Route them through the
cable clips as shown and make a complete loop, this
ensures the correct routing and storage of required slack.
By a additional loop, a corresponding extra length can be
added.
Then pass the remaining loose tube length of approx. 1.8m
through the cut out onto the front of the splice tray holder.
Move the splice tray holder back to the starting position.
Remove the routing block's cover and then route the loose
tubes into the tube holder.