TKF ACE TCB-O Manual Download Page 1

 
 

 

Installation instruction ACE Tower Connection Box-O 

 

ACE-II-5641xx_TCB-O-general-v01-e 

Date : 

16-03-2021 

 

   

 

 

 

 

 

 

Spinnerstraat 15 | Postfach 6 | 7481 KJ Haaksbergen | die Niederlande | Telefon: +31(0)53 573 22 55 | Email[email protected] 

 

 

1/16 

 

 

www.ace-fibreoptic.com

 

 

Technische Änderungen vorbehalten | Aus diesen Informationen können keine Rechte abgeleitet werden 

Table of Contents 

1

 

Introduction .................................................................................................................................................................... 2

 

1.1

 

Reference .............................................................................................................................................................. 2

 

1.2

 

Document history ................................................................................................................................................... 2

 

1.3

 

General remark ...................................................................................................................................................... 2

 

2

 

General .......................................................................................................................................................................... 3

 

2.1

 

Basic configuration ................................................................................................................................................. 3

 

2.2

 

Basic pre-assembled setup .................................................................................................................................... 4

 

2.3

 

Dimensions ............................................................................................................................................................ 4

 

2.4

 

Tools ...................................................................................................................................................................... 5

 

3

 

Installation of the TCB-O ................................................................................................................................................ 5

 

3.1

 

Preparation ............................................................................................................................................................ 5

 

3.2

 

Installation .............................................................................................................................................................. 5

 

3.2.1

 

Wall mounting ............................................................................................................................................ 6

 

4

 

Assembly Splice Tray Holder ......................................................................................................................................... 7

 

4.1

 

TCB-O variant fully equipped ................................................................................................................................. 7

 

4.2

 

TCB empty or only partially assembled .................................................................................................................. 7

 

4.2.1

 

Splice tray assembly .................................................................................................................................. 7

 

4.2.2

 

Splitter tray assembly ................................................................................................................................ 7

 

4.2.3

 

Patch tray assembly .................................................................................................................................. 7

 

5

 

Cable routing and installation ......................................................................................................................................... 8

 

5.1

 

Cable feed from the operator ................................................................................................................................. 8

 

5.1.1

 

Feeder cable fiber layout plan ................................................................................................................. 11

 

5.1.2

 

Splitter output fibers ................................................................................................................................. 11

 

5.2

 

Cable feed from the subscriber ............................................................................................................................ 12

 

5.2.1

 

Subscriber fiber layout plan ..................................................................................................................... 13

 

5.3

 

Preparation Connection 2

nd

 Operator ................................................................................................................... 13

 

5.4

 

Completion of installation and locking of the TCB ................................................................................................ 14

 

6

 

Connection of 2

nd

 Operator .......................................................................................................................................... 15

 

7

 

Variants and accessories ............................................................................................................................................. 16

 

8

 

Appendix .................................................................................................................. 

Fehler! Textmarke nicht definiert.

 

8.1

 

Tray layout plan SSP 25 .................................................................................. 

Fehler! Textmarke nicht definiert.

 

8.2

 

Tray layout plan SSP 13/25 ............................................................................. 

Fehler! Textmarke nicht definiert.

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for ACE TCB-O

Page 1: ...3 2 Installation 5 3 2 1 Wall mounting 6 4 Assembly Splice Tray Holder 7 4 1 TCB O variant fully equipped 7 4 2 TCB empty or only partially assembled 7 4 2 1 Splice tray assembly 7 4 2 2 Splitter tray...

Page 2: ...irect connection with patch cable 1 1 Reference This document refers to the current versions of the following documents Document number Title Author ACE DS TubeClip ACE Tube Clip TKF ACE DS MDIC Datas...

Page 3: ...ce Base Cover Splice Tray Holder pivotable Routing block SC Splice tray with Crimp splice protection holder Splitter tray with splitter SC Splice tray with Crimp splice protection holder Patch tray LC...

Page 4: ...tray for splicing on to the cables coming from the subscriber 4 fibers The output patch port 3 4 is connected by the patch cables to the adapter in the patchfield box for open access functionality Th...

Page 5: ...er The left starting position of the distribution box depends on the cable routing from the ceiling or from the side so that these can be inserted into the entry box on the left side taking into accou...

Page 6: ...Align the TCB at the wall and observe the required working space Mark the mounting positions Below you will find the corresponding dimensions for the drilling pattern Drill the appropriate holes into...

Page 7: ...first Splice tray block direct at the routing block of the pre assembled Splice Tray Holder or depending on the configuration on top of other blocks Additional splice tray blocks need to be mounted a...

Page 8: ...he 4 round foam the rails The feeder cable of the operator e g 48 fibers in 4 buffer tubes is inserted at the top position in the tube clip at the rails and routed through the foam sealing via the upp...

Page 9: ...holder in a bow as shown in the figure Route them through the cable clips as shown and make a complete loop this ensures the correct routing and storage of required slack By a additional loop a corre...

Page 10: ...appx 10mm above the tube holder Strip the loose tubes and clean the fibers in accordance to the cable manufacturer instructions Route the loose tubes and fibers back to the routing block Snap the loo...

Page 11: ...ure the direction of the feeder cable fiber is changed since both the splitter input fiber from the above splitter trays and the feeder cable fiber are fed from the left hand channel to the tray The f...

Page 12: ...r of 3 7 mm through the cable protection tube at a length of approx 3 4m Press them like the feeder cable into the foam seal and route the cable via the cable routing bracket in the base downwards and...

Page 13: ...plice the 4 fibers of the subscriber onto the 4 pigtails position number 12 of the scope of delivery and place the Crimp splice protection in the holder Make sure that the splice plan and port assignm...

Page 14: ...number 4 on port 4 Ensure that the connector is correctly locked in the adapter Insert the patch cable on the right hand side into the guide channel When the tray assembly is completed fold down the...

Page 15: ...a the internal patch cable to the subscriber connections The pigtails in the patch trays have should be spliced accordingly in advance According to the layout plan in the documentation the relevant su...

Page 16: ...65 Patch tray block loaded with 3 SE patch trays PF 568033 Cover splice tray PF blue 568034 Cover patch tray PF green 510700 Tube clip for 7 8mm tube 510701 Tube clip for 10 mm tube 510702 Tube clip f...

Reviews: