20
2.2.5
General layout of the “SpeedBlade” turnstile access ways
Fig. 9
–
“SpeedBlade” type turnstile layout options
2.2.6
Installation procedure.
The turnstile installation procedure is as follows:
1) The package integrity to be checked prior to unpacking. If package is damaged, then
damages to be fixed (picture to be taken, damage report to be made);
2) The turnstile to be unpacked and inspected for defects and damages as well as
completeness to be checked according to the turnstile data sheet;
WARNING:
When the turnstile damages are detected or in case of shortage of delivery
installation work to be stopped and the turnstile supplier to be referred to.
3) Turnstile disassembly and redeployment:
The turnstile removal from pallet (See
Figure 10)
. The turnstile U-shape door to be taken off
to access fixation holes and terminal blocks:
-
End screws to be unscrewed and table board to be removed (View А);
-
Two frame screws to be loosened and removed and the turnstile door to be taken off (View
B);