
Table of Contents
iii
43 LS
43 LS
Plumbing Systems
5.1 Fresh Water System
................................. 5-1
5.2 Freshwater System Commissioning
........ 5-2
5.3 Marine Head System ............................... 5-4
5.4 Washdowns (optional) .............................. 5-7
5.5 Drainage
.................................................. 5-7
5.6 Plumbing System Maintenance ................ 5-9
Safety Labels
Interior ............................................................... 1
Exterior .............................................................. 2
Safety Label Locations ...................................... 4
General Information
Engine and General Specifications
................... 9
Boat Information .............................................. 10
Pre-Cruise Checklist
Fire Extinguisher Locations
............................. 13
Pre-Cruise Checklist ........................................ 13
Propulsion Systems
1.1 General
..................................................... 1-1
1.2 Saltwater Application
................................ 1-1
1.3 Engine Lubrication .................................... 1-2
1.4 Engine Cooling System ............................ 1-2
1.5 Engine Flush System
............................... 1-2
1.6 Propellers ................................................. 1-3
1.7 Engine Instrumentation............................. 1-3
1.8 Seakeeper Gyro Stabilization System
(optional) ................................................ 1-3
Helm Systems
2.1 General
..................................................... 2-1
2.2 Helm Access
............................................. 2-1
2.3 Engine Monitoring Displays
...................... 2-1
2.4 Engine Throttle and Shift Controls ............ 2-1
2.5 Neutral Safety Switch .............................. 2-2
2.6 Automatic Fire Suppression System
........ 2-2
2.7 Engine Stop Switch .................................. 2-3
2.8 Engine Power Tilt and Trim....................... 2-4
2.9 Steering System ....................................... 2-4
2.10 Trim Tabs ................................................ 2-4
2.11 Compass ................................................. 2-5
2.12 Bow Thruster .......................................... 2-5
2.13 Joystick ................................................... 2-6
2.14 Spotlight (optional).................................. 2-6
Fuel Systems
3.1 General
..................................................... 3-1
3.2 Fuel System
.............................................. 3-1
3.3 Diesel Generator Fuel System
................. 3-4
3.4 Fuel System Maintenance
........................ 3-6
Electrical Systems
4.1 General
..................................................... 4-1
4.2 12-Volt DC System
................................... 4-1
4.3 12-Volt DC Helm Switches
....................... 4-3
4.4 DC Distribution Panel
............................... 4-4
4.5 Seakeeper Gyro (optional)
....................... 4-5
4.6 AC System
................................................ 4-5
4.7 AC Distribution Panel
................................ 4-5
4.8 Other Electrical Controls........................... 4-7
4.9 Shore Power Connection.......................... 4-7
4.10 Generator
............................................... 4-8
4.11 Electrical System Maintenance ............. 4-10
Plumbing Systems
5.1 Freshwater System
................................... 5-1
5.2 Freshwater System Commissioning
........ 5-2
5.3 Marine Head System ............................... 5-5
5.4 Washdowns (optional) .............................. 5-7
5.5 Drainage
.................................................. 5-8
5.6 Plumbing System Maintenance .............. 5-10
Ventilation Systems
6.1 Air Conditioning System
........................... 6-1
6.2 Portlights .................................................. 6-1
6.3 Carbon Monoxide .................................... 6-1
6.4 Bilge Ventilation ........................................ 6-2
6.5 Maintenance ............................................. 6-2
Summary of Contents for C49
Page 1: ...2022 STANDARDS OPTIONS 2022 OWNERS MANUAL ...
Page 4: ...This page intentionally left blank ...
Page 8: ...Safety Information ii 43 LS Operator Notes ...
Page 13: ...Safety Labels 3 43 LS 10 19 18 17 11 37 7 12 12 27 28 2 2 22 12 15 14 13 6 23 4 5 ...
Page 28: ...Section 1 Propulsion Systems 1 4 43 LS Operator Notes ...
Page 42: ...Section 3 Fuel Systems 3 8 43 LS Operator Notes ...
Page 66: ...Section 5 Plumbing Systems 5 12 43 LS Operator Notes ...
Page 78: ...Section 7 Exterior Equipment 7 10 43 LS Operator Notes ...
Page 98: ...Section 10 Operation 10 10 43 LS ...
Page 106: ...Section 11 Routine Maintenance 11 8 43 LS Operator Notes ...
Page 112: ...Section 12 Seasonal Maintenance 12 6 43 LS Operator Notes ...
Page 118: ...Appendix A Glossary of Terms A 6 Operator Notes ...
Page 120: ...Appendix B Maintenance Guides B 2 Operator Notes ...
Page 122: ...Appendix C Maintenance Schedule C 2 Date Hours Dealer Service Repairs ...
Page 123: ...Maintenance Schedule Appendix C C 3 Date Hours Dealer Service Repairs ...
Page 124: ...Appendix C Maintenance Schedule C 4 Date Hours Dealer Service Repairs ...
Page 131: ...Float Plan Appendix E E 1 Float Plan ...
Page 132: ...Appendix E Float Plan E 2 ...
Page 134: ...Appendix E Float Plan E 4 Operator Notes ...
Page 138: ...Appendix F Troubleshooting Guide F 4 Operator Notes ...
Page 139: ...Schematics Appendix G G 1 Schematics ...
Page 140: ...Appendix G Schematics G 2 ...
Page 141: ...Schematics Appendix G G 3 ...
Page 142: ...Appendix G Schematics G 4 ...
Page 143: ...Schematics Appendix G G 5 ...
Page 144: ...Appendix G Schematics G 6 ...
Page 145: ...Schematics Appendix G G 7 ...
Page 146: ...Appendix G Schematics G 8 ...
Page 147: ...Schematics Appendix G G 9 ...
Page 148: ...Appendix G Schematics G 10 ...
Page 149: ...Schematics Appendix G G 11 ...
Page 150: ...Appendix G Schematics G 12 ...
Page 151: ...Operator Notes ...
Page 152: ...725 E 40th Street Holland MI 49423 616 392 7163 tiarayachts com ...