background image

 5

Contents

1.1 Transport and handling 

6

 

1.2 Packaging and storage 

7

 

1.2.1 Standard packaging 

7

 

1.2.2 Long-term packaging 

7

 

1.3 Installation 

8

 

1.3.1 Preparation 

8

 

1.3.2 Bolts 

9

 

1.3.3 Operating temperature 

9

 

1.3.4 Duty cycle 

9

 

1.3.5 Start-up 

9

 

1.3.6 Drive shaft and connecting flange variations 

10

 

1.4 Lubrication 

11

 

1.4.1 Slew drive lubrication 

11

 

1.4.2 Lubrication interval 

11

 

1.5 Inspection 

12

 

1.5.1 Inspection of bolts 

12

 

1.5.2 Inspection of sealing system 

12

 

1.5.3 Inspection of raceway system 

13

 

1.5.4 Inspection of worm gear’s circumferential backlash 

14

 

1.5.5 Lubricant analysis 

14

 

1.6 Disposal at end of useful life 

15

 

1.7 thyssenkrupp rothe erde services 

15

Installation, lubrication and 
maintenance (ILM) of slew drives

thyssenkrupp rothe erde Germany GmbH offers you 
comprehensive service,  

including:

  Installation and start-up,
  Inspection and maintenance,
  Replacement and repairs.

You can find more information and the thyssenkrupp 
rothe erde Germany GmbH range of training offers on 
our website at: 

https://www.thyssenkrupp-rotheerde.com/en/
products/rothe-erde-slew-drives 
https://www.thyssenkrupp-rotheerde.com/en/service/
training-courses

Summary of Contents for rothe erde

Page 1: ...1 rothe erde slew drives Installation Lubrication Maintenance...

Page 2: ...2 3 rothe erde slew drives developed for your application...

Page 3: ...Inspection of raceway system 13 1 5 4 Inspection of worm gear s circumferential backlash 14 1 5 5 Lubricant analysis 14 1 6 Disposal at end of useful life 15 1 7 thyssenkrupp rothe erde services 15 In...

Page 4: ...packaging are vacuum packed in a special foil with desiccant bags silica gel enclosed A hygrometer is attached for checking the relative humidity see table 2 The long term packaging includes a transp...

Page 5: ...depositing the load Inspect the site before depositing Be aware of co workers Please check that the contact surfaces for the slew drive are level The maximum permitted deviation from levelness under...

Page 6: ...r a longer period Delayed start up With key connection With spline shaft YROYHQWLVFKH 9LHO DKQQDEH DFKHU X OQYROXWH VSOLQHG KXE DW URRW 1 1 4 ANSI B92 1 7ROHUDQ NODVVH 7ROHUDQFH FODVV N 14 P PS 12 24...

Page 7: ...effect of elastic deformation of the connect ing structure the measurement should be taken as close to the slew drive as possible 1 5 Inspection DANGER Risk of accident and danger of death if the max...

Page 8: ...ate evaluation of wear and determination of further action thyssenkrupp rothe erde Germany GmbH will perform the analysis of the grease sample Please contact us 1 5 4Inspection of worm gear s circumfe...

Page 9: ...krupp rothe erde Spain S A Carretera Castell n km 7 Pol gono Industrial La Cartuja 50720 Zaragoza Spain P 34 9 76 50 04 80 M roteisa roteisa es America thyssenkrupp Brasil Ltda Division rothe erde Rua...

Reviews: