background image

10 

ILM for rothe erde

®

  slew drives 

11

ǵ 0,4

ǵ 82,55 H8

+0,054
  0

A

M12

M12

A

20

20

48

15

10,5 ± 0,5

E – E

Maximale Länge für Motorwelle
Maximun length for motor hub

106,4

71

137

100

E

E

R45

Bohrung für Motorwelle Ø25j6/k6
mit Passfeder A8 × 7 DIN 6885
Hole for motor shaft Ø25j6/k6
with fitting key A8 × 7 DIN 6885

The slew drives are adequately lubricated with “Mobil UNIREX N3” 
grease on delivery. The grease filling reduces friction, protects 
against corrosion and is a component of the sealing. If using other 
lubricants, please obtain confirmation from the lubricant manufac-
turer that the product is suitable. Please also confirm with thyssen-
krupp rothe erde that the lubricant is suitable and compatible with 
the plastic components.

Note:  Lubricants are harmful to water. Do not allow them to 
escape into the soil, ground water or sewer system. Please comply 
with national regulations.

Please consult with thyssenkrupp rothe erde Germany GmbH if 
using an automatic lubrication system.

The first follow-up lubrication (using the grease named above) 
should take place on installation such that a visible collar of grease 
is formed on the seals. 

Lubrication should be repeated after no more than 6 months, 
including for:
•  Partially assembled slew drives,
•  Slew drives before the equipment will be taken out of service or 

after it has been out of service for a longer period,

•  Delayed start-up.

With key connection:

With spline shaft:

(YROYHQWLVFKH9LHO]DKQQDEHƪDFKHU)Xž
OQYROXWHVSOLQHGKXEƪDWURRW
1 1/4"-ANSI B92.1

7ROHUDQ]NODVVH7ROHUDQFHFODVV

N=14 / P/P

S

=12/24/ 

 = 30°

ǵ 

136

73

E

E

ǵ 1

34

R70

Maximale Länge für Motorwelle

Maximun length for motor hub

ǵ 0,4

ǵ 82,55 H8

+0,054
  0

A

M12

M12

A

106,4

20

20

58

19

10,5 ± 0,5

E – E

SE 0626-L

1.4 Lubrication

 

WARNING

Lubricants may be hazardous to health 

• Wear gloves at a minimum when handling 

lubricants 

• Please follow the lubricant manufacturer’s 

instructions 

1.4.1 Slew drive lubrication

1.4.2 Lubrication  interval

Lubricant should be applied while the worm drive is being turned.

The slew drive should be lubricated using the lubricating nipples 
shown in Figure 2 until a collar of fresh grease is formed along the 
full circumference of the seals. 
The old grease should be removed before each fresh application of 
lubricant.

The remaining lubricated connections in Figure 3 need only be 
lubricated with a small amount of grease.

Figure 2: Position of lubricated holes -> slew drive

1.3.6 Drive shaft and connecting 

flange variations

(YROYHQWLVFKH9LHO]DKQQDEHƪDFKHU)Xž
OQYROXWHVSOLQHGKXEƪDWURRW
1 1/4"-ANSI B92.1

7ROHUDQ]NODVVH7ROHUDQFHFODVV

N=14 / P/P

S

=12/24/ 

 = 30°

100

71

E

E

ǵ 1

34

R70

ǵ 82,55 H8

+0,054
  0

M12

M12

A

106,4

20

20

58

19

10,5 ± 0,5

E – E

Maximale Länge für Motorwelle

Maximun length for motor shaft

ǵ 0,4 A

SE 0479-L

(YROYHQWLVFKH9LHO]DKQQDEHƪDFKHU)Xž
OQYROXWHVSOLQHGKXEƪDWURRW
1 1/4"-ANSI B92.1

7ROHUDQ]NODVVH7ROHUDQFHFODVV

N=14 / P/P

S

=12/24/ 

 = 30°

100

71

E

E

ǵ 1

34

R70

Summary of Contents for rothe erde

Page 1: ...1 rothe erde slew drives Installation Lubrication Maintenance...

Page 2: ...2 3 rothe erde slew drives developed for your application...

Page 3: ...Inspection of raceway system 13 1 5 4 Inspection of worm gear s circumferential backlash 14 1 5 5 Lubricant analysis 14 1 6 Disposal at end of useful life 15 1 7 thyssenkrupp rothe erde services 15 In...

Page 4: ...packaging are vacuum packed in a special foil with desiccant bags silica gel enclosed A hygrometer is attached for checking the relative humidity see table 2 The long term packaging includes a transp...

Page 5: ...depositing the load Inspect the site before depositing Be aware of co workers Please check that the contact surfaces for the slew drive are level The maximum permitted deviation from levelness under...

Page 6: ...r a longer period Delayed start up With key connection With spline shaft YROYHQWLVFKH 9LHO DKQQDEH DFKHU X OQYROXWH VSOLQHG KXE DW URRW 1 1 4 ANSI B92 1 7ROHUDQ NODVVH 7ROHUDQFH FODVV N 14 P PS 12 24...

Page 7: ...effect of elastic deformation of the connect ing structure the measurement should be taken as close to the slew drive as possible 1 5 Inspection DANGER Risk of accident and danger of death if the max...

Page 8: ...ate evaluation of wear and determination of further action thyssenkrupp rothe erde Germany GmbH will perform the analysis of the grease sample Please contact us 1 5 4Inspection of worm gear s circumfe...

Page 9: ...krupp rothe erde Spain S A Carretera Castell n km 7 Pol gono Industrial La Cartuja 50720 Zaragoza Spain P 34 9 76 50 04 80 M roteisa roteisa es America thyssenkrupp Brasil Ltda Division rothe erde Rua...

Reviews: