O
PERATING MANUAL
DAB530
C
OMMISSIONING
6.
Commissioning
Before commissioning the machine, the following points should be checked
and carried out:
•
Safety, auxiliary and installation tools removed from the danger zone
•
Setup and alignment of machine, frame and rope departure checked
•
Mounting of the machine and base frame checked
•
Bolts tightened and secured with the prescribed torque (see table
'Tightening torques', 9)
•
Brake shoe stroke and setting checked
•
Setting and function of the brake test switches checked
•
Brake test carried out with one brake shoe in each case
•
Brake release with lever function checked
•
Protective cover fitted
•
Function of safety switch on the cover plate of the hand drive mounting
checked
•
Distance of the pulse encoder in weight-loaded state of the traction
sheave checked
•
Power connections, grounding of motor, brake magnet, test switches and
pulse generator connections security regulations according to legal
regulations and safety instructions
•
Special add-on components (optional) properly mounted and function
checked
•
Direction arrow (Up / Down) attached on the pedestal bearing and clearly
visible according to the direction of travel
ThyssenKrupp Aufzugswerke GmbH
34
Version 03/2017
Summary of Contents for Drive DAB530
Page 1: ...ThyssenKrupp Aufzugswerke Operating Manual Drive DAB530...
Page 3: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ...ThyssenKrupp Aufzugswerke GmbH...
Page 69: ...ThyssenKrupp Aufzugswerke GmbH...
Page 70: ...ThyssenKrupp Aufzugswerke GmbH...
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 85: ......