![THORLABS LFE1220W-EU Installation Manual Download Page 36](http://html1.mh-extra.com/html/thorlabs/lfe1220w-eu/lfe1220w-eu_installation-manual_1110947036.webp)
LFE1220W-US, -EU, and -UK Laminar Flow Enclosures
Chapter 3: Installation
Page 34
ETN056370-D02
36. Check that all the screws are tight, and the legs are square to the roof frame. There should be no gaps.
37. Prepare four Corner Gusset RH (I) and four Corner Gusset LH (J) by pre-installing the fasteners. Each Gusset
requires five M6 Washers (AB), five Hammer Head Screws (AD), and five M6 Nuts (AE). The nuts should not be
tightened. Only fit the nut sufficient turns to engage the threads.
Figure 34 Preparing the Corner Gussets
Summary of Contents for LFE1220W-EU
Page 68: ...www thorlabs com...