TSC 80 TRANSFER SWITCH CONTROLLER
PM063 Rev 7 09/02/27
Thomson Technology
26
NOTE
When a configuration jumper is not required, the jumper should
be connected to only one pin of the header to conveniently
store it for future use.
4.1.4. GEN EXERCISE LOAD TEST MODE (NO XFER)
A configuration jumper is provided to select the desired testing mode (i.e. load
test with transfer or no-load test) for the 7 day/30 minute generator exercise
function or for a remotely initiated Test mode. One jumper is provided to set
the desired test mode as follows:
•
Load Test Gen Exercise Test Mode: no program jumper is required.
NOTE
The No-Load Test mode is the factory default setting.
•
No-Load Gen Exercise Test Mode: program jumper is required to be
placed across the 2 pins, adjacent to the text on the PCB.
NOTE
Should utility power fail during a no-load test operation, the load
will automatically transfer to the generator and will re-transfer
back when utility power is restored to within normal conditions.
The engine will continue to run until the 30 minute exercise time
delay period expires.
NOTE
When a configuration jumper is not required, the jumper should
be connected to only one pin of the header to conveniently
store it for future use.
4.1.5. SECURE
A configuration jumper is provided to inhibit the test pushbuttons on the Lexan
faceplate, for security purposes.
•
For normal automatic transfer switch operation, no configuration jumper
is required.