background image

INSTALLATION 

 

 

3.

 

BOILER MOUNTING 

3.1.

 

Transportation and delivery 

The boiler is delivered on wood pallet, well positioned with metal plates. Remove them carefully 
by unscrewing the screws holding them in place.  
The loading and unloading of the boiler must be performed with a forklift or a crane.  
 

The  boiler  is  very  heavy.  Do  not  try  to  lift  by  hands  or  other  unsuitable 
equipment. Danger of injury! Perform all moves with extreme caution. 

 
Remove  the  boiler  packaging  with  attention.  Keep  the  packaging  material  away  from 
children since it can be dangerous. 
After having unpacked everything, make sure that the 
appliance is intact and undamaged. In case of doubt do not use the appliance and inform the 
supplier.  
 
The ECOTWIN boiler is delivered with the following equipment: 

 

Boiler steel body 

 

Rockwool insulation mounted on the boiler body 

 

Metal covers mounted on the boiler body 

 

Pellet burner 

 

Fuel feeder 

 

Fuel tank 

 

Ash box 

 

Cleaning tools 

 

Chain regulator 

 

A second door for alternative wood combustion (optional) 

 

In the documentation folder you will find: 

 

Technical manual 

 

Warranty leaflet 

 

Declaration of conformity 
 

3.2.

 

Boiler room 

3.2.1.

 

General requirements  

The boiler must be installed in a special and separate room. This room must be chosen so that 
it offers easy access for fuel transport, air supply and exhaust gas evacuation. The doors of the 

boiler room must be metallic, open outwards, and have at least 0,9 m width.  

The  boiler  installation  is  prohibited  in  rooms  with  extensive  dust,  dangerous 

gases, and moist spaces.  

For  the  correct  boiler  function  it  is  necessary  that  the  boiler  room  has  openings  for  natural 
ventilation and combustion air supply. It is recommended that two different openings are used 
for this purpose, positioned on opposite walls and diagonally to ensure good air circulation. The 
total surface of the openings must be at least 1/12 of the boiler room surface. Forced ventilation 
is prohibited in the boiler room.  
The boiler room must be provided with a drainage channel. All safety devices must be connected 
to this channel.  
The boiler room must have an appropriate fire extinguishing system, according to the regulations 
in force. In case that the building is designed with a fire alarm system, a smoke detector must 

be positioned on top of every boiler.  
The fuel storage is prohibited in the boiler room. If so, the storage must be separated from the 

boiler with a non-flammable wall, and proper distanced from the boiler.    
 
 

Summary of Contents for ECOTWIN ECT 100

Page 1: ...COMBINED WOOD AND PELLET BOILER ECOTWIN INSTALLATION AND USER MANUAL VERSION 2 1 UPDATE 18 01 2019...

Page 2: ...16 4 5 Connection diagrams 17 5 ELECTRICAL CONNECTIONS 18 5 1 General instructions 18 5 2 Electrical connection diagram 18 6 CONTROLLER 19 6 1 General description 19 6 2 Description of buttons 19 6 3...

Page 3: ...f the appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you resp...

Page 4: ...nger Removable rear smoke box with inspection cleaning door Upper door for cleaning the heat exchanger Lower door with flange for pellet burner mounting Lower door with air door for manual wood functi...

Page 5: ...370 ECT 40 340x385 1220 1195 735 885 1035 880 1135 1470 ECT 50 465x425 1220 1310 865 1015 1165 1000 1035 1350 ECT 60 465x425 1220 1310 865 1015 1165 1000 1135 1450 ECT 80 565x510 1220 1650 990 1140 12...

Page 6: ...73 7 14 11 22 12 25 16 32 16 32 Water pressure drop 20 mbar 20 24 32 48 52 60 64 Water contents l 100 120 130 170 190 370 440 Fire chamber length mm 480 580 680 580 680 850 1050 Weight empty kg 298 3...

Page 7: ...and efficient function and a long lifespan it is strictly recommended that only dry wood is used with a humidity content of 15 Practically this means at least one year dry wood Maximum humidity conten...

Page 8: ...bigger and the cleaning interval more often Table 2 Pellet fuel characteristics The quality of the pellets calorific power humidity and ash content is very important for the boiler function and effic...

Page 9: ...oom 3 2 1 General requirements The boiler must be installed in a special and separate room This room must be chosen so that it offers easy access for fuel transport air supply and exhaust gas evacuati...

Page 10: ...boiler s efficient and safe function The chimney must be positioned if possible in the interior of the building It must be vertical with no changes in the direction The cross section of the chimney ca...

Page 11: ...INSTALLATION 11 Each boiler should be connected to an independent chimney Connection of multiple boilers to the same chimney is not recommended Fig 3 Chimney distances Fig 4 Chimney connection...

Page 12: ...Remove the side cover Instal the hinge screw on the front plate of the boiler according to drawing with fixing nut and tightening nut and fix tightly Place the door into position by introducing the h...

Page 13: ...INSTALLATION 13 Fig 6 Mounting the two doors...

Page 14: ...e you fill it with pellets The feeder must be positioned with inclination optimum at 30 45o to the floor The pellet feeder cannot be positioned at angle more than 45o nor vertically or horizontally Af...

Page 15: ...2 Return temperature protection For the correct function of the boiler and for protection against corrosion it is very important to ensure steady temperature at the return of the boiler of at least 55...

Page 16: ...ke sure the network functions properly at working temperature and pressure The hardness of the mains water supply affects the boiler s life span It is recommended to use a water softener if water hard...

Page 17: ...ssure reducer 17 Drainage valve F Filter 18 Cold water valve A Air relief valve 19 24 One way valves FD Water softener 4 5 2 Closed expansion vessel connection Legend 1 9 Separation valves B Hot water...

Page 18: ...n plastic channel The main electrical supply of the boiler must be connected to an independent safety of max 16A The boiler room lighting must be on a separate circuit The user is obliged to connect t...

Page 19: ...n Function 1 Changes the burner s working mode STOP IGNITION AUTOMATIC WORK 2 Return to the previous menu 1 Entry on the Menu s parameters 2 Saves the change of a parameter 1 In the Ignition MODE acti...

Page 20: ...W buffer if the function is active On the screen appears which function is currently used by the driver The burner may work in three working modes STOP IGNITION AUTOMATIC WORK The mode changes when th...

Page 21: ...e in the STOP mode or in the temporal working mode of the burner STANDBY Standby of the burner for the decline of the temperature of a hysteresis if the burner s working mode is in the temporal mode 6...

Page 22: ...e than 10o C Continuous mode The burner reaches the desired HEATING WATER TEMPERATURE and goes down at 3kW maintain When the boiler s temperature goes down to the temperature HEATING WATER TEMPERATURE...

Page 23: ...f wood Using sheets of thin paper light the wood placed inside the boiler Close the door of the boiler Wait several minutes until the flame develops and produces some embeds After formation of embeds...

Page 24: ...cks to carry after initial start up During the first start up you need to carefully check the air tightness of all the connections especially the doors and the connection with the chimney Check that t...

Page 25: ...kW Maintain mode 7 The burner works at Maintain mode till the boiler s water temperature goes down to the temperature HEATING WATER TEMPERATURE CH FURNACE HYSTERESIS 7 7 2 Stopping the burner 1 The bu...

Page 26: ...use of wood when the burner is mounted on the boiler is prohibited 7 8 Chimney damper adjustment The boiler chimney pipe is equipped with a damper This can be set in various positions to throttle the...

Page 27: ...ove the turbinators from the tubes and clean the tubes with the appropriate tool Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as shown in Fi...

Page 28: ...burners tube and close back the door 7 By pressing the button MODE once changes the operation from Stop to ignition By pressing the button MODE changes the operation from Ignition to Automatic The fr...

Page 29: ...stallation and function of the pumps and safety devices 8 5 2 Restart the burner after an error 1 Turn off the burner by using the electric switch the burner is connected 2 Open the boiler s door and...

Page 30: ...functions properly Make sure all the ball valves of the boiler and other relative equipment are open Check the function of the pumps They might be blocked after long stop Check that there have been no...

Page 31: ...igher than 70o C Back fire protection This is happened either the chimney s draught is no the appropriate or the burner hasn t been cleaned If the temperature goes down to 60 o C and the photo sensor...

Page 32: ...e utilizeaz combustibili solizi cu nc rcare manual i automat cu puterea util mai mic sau egal cu 500 kW Terminologie cerin e ncercare i marcare Heating boilers Part 5 Heating boilers for solid fuels h...

Page 33: ...THERMOSTAHL ROMANIA HEATING SYSTEMS S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro...

Reviews: