background image

9

APPLICATION

Electric vehicle recovery time

Following a power cut to the electric vehicle supply equipment (EVSE), a 
15 minutes delay is initiated to monitor the total consumption of the elec-
trical system. Power to the vehicle will then be restored if the total load 
consumption is lower than 80% of the main circuit breaker rating.

Electric vehicle charging time 

It is recommended to schedule the charging vehicle program during 
hours of low electrical consumption to minimize interruptions to the 
electric charging station.

MAINTENANCE

Do not use any cleaning solvents to clean the DCC.

LIGHTS CODE

Green

The charging station is energized.

Green

The charging station is energized. The total 
load exceeds 80%. If the loads exceed 80% 
for a predetermined period, the charging 
station will be de-energized.

Yellow

The charging station is not energized. The 
total loads exceed 80%. The resumption 
time will start when the total load is lower 
than 80%.

Yellow

The charging station is not energized. 
The total load is lower than 80% and 
the recovery time is in progress. Each 
flash mean two (2) minutes before the 
resumption of power to the charging station. 
(ex: 3 flashes = 6 minutes before power to 
the charging station). During that period, 
if the total load exceeds 80%, the recovery 
time will restart from the beginning.

Red

Malfunction: 
1) Check all connections and voltage. 
2) Check the DIP switch configuration 
settings. 
3) Check if the current transformers (CT) 
are properly connected and interlocked. 
4) Check if the connection for the current 
transformers are properly connected to the 
PCB electronics. 
5) If the problem persists, send pictures of 
the installation at [email protected] 
and then call 1 (833) 717-1355.

OFF

No power. Check the power source.

Summary of Contents for DCC-9 Series

Page 1: ...240 208V Single Phase 60A 70A 80A 90A 100A 125A ALIMENTATION PRINCIPALE 120 240 208V Monophas 60A 70A 80A 90A 100A 125A APPROVED MARKET North America MARCH AGR Am rique du Nord MODELS MOD LES DCC 9 3...

Page 2: ...2...

Page 3: ...licensors Additional information s are available on request The following logos are trade names or trademarks of THERMOLEC LTE E RECHARGE V HICULE LECTRIQUE in the United States and in Canada The DCC...

Page 4: ...ric power source is adequate for the use of the DCC Charge controller for electric vehicles Do not use any cleaning solvents to clean the DCC Charge controller for electric vehicles Limited warranty 1...

Page 5: ...for electric vehicles will provide power to a charging station through a 30A 40A 50A or 60A 240 208V AC circuit breaker L1 L2 and ground The DCC is equipped with a Square D cir cuit breaker QUO230 QUO...

Page 6: ...proper ins tallation Ceiling installation The installation may be done in any direction WARNING Warranty automatically void if the DCC is installed incorrectly STEP 3 INSTALLATION Ceiling installation...

Page 7: ...T Suivre les codes lectriques nationaux et locaux ainsi que les instructions contenues dans l appareil IMPORTANT Wire in accordance with local and National Electrical codes Read instructions carefully...

Page 8: ...240 208V Orange STEP 6 START UP DCC power supply 1 Supply electrical power to the DCC 2 Wait ten 10 seconds 3 Check if the contactor is switched on 4 Check the pilot light GREEN at all time compliant...

Page 9: ...rging station will be de energized Yellow The charging station is not energized The total loads exceed 80 The resumption time will start when the total load is lower than 80 Yellow The charging statio...

Page 10: ...dants de licence Ce manuel d installation ne peut pas tre modifi reproduit ou copi en tout ou en partie sans l autorisation crite pr alable de THERMOLEC LTE E RECHARGE V HICULE LECTRIQUE et ses conc...

Page 11: ...s assurer que la source d alimentation lectrique soit suffisante pour permettre l utilisation d un ou de plusieurs DCC Contr leur de charge pour v hicules lectriques Ne pas utiliser de solvants de net...

Page 12: ...riques peut per mettre l alimentation d une borne de recharge avec un disjoncteur de 30A 40A 50A ou 60A 240 208V CA L1 L2 et avec mise la terre Le DCC est muni par d faut d un disjoncteur Square D QUO...

Page 13: ...vous aux indications sur le boitier afin d assurer que l orientation de l installation soit conforme Installation au plafond L installation peut tre faite dans toutes les orientations ATTENTION Garant...

Page 14: ...208V Orange T 24V 240V 208V COM TRANSFORMER TRANSFORMATEUR 50VA 240 208V Orange TAPE 6 MISE EN MARCHE Alimentation du DCC 1 Alimenter le DCC en lectricit 2 Attendre dix secondes 3 V rifier si le conta...

Page 15: ...NT Suivre les codes lectriques nationaux et locaux ainsi que les instructions contenues dans l appareil IMPORTANT Wire in accordance with local and National Electrical codes Read instructions carefull...

Page 16: ...IP switch 3 V rifier si les transformateurs de courant CT sont bien connect s et bien enclench s 4 V rifier la connexion des transformateurs de courant aux terminaux de la carte lec tronique et la pol...

Reviews: