![thermofin X-TDH.3-100-22-G-N-D5-BC-04 Operating And Installation Instructions Download Page 27](http://html1.mh-extra.com/html/thermofin/x-tdh-3-100-22-g-n-d5-bc-04/x-tdh-3-100-22-g-n-d5-bc-04_operating-and-installation-instructions_1105574027.webp)
Operating and installation instructions
08.02.2021 – Version 1.1
Dry cooler
X-TDH.3-100-22-G-N-D5-BC-04
Page: 27/31
Operating and installation instructions for dry cooler translation into English © thermofin GmbH
The following applies for all units: Exceeding the maximum pressure must be prevented!
Fans should be put into operation for 3 to 4 hours per month if they are not used for longer
periods.
6.6 Disposal
Empty the system properly in a technically correct manner; properly dispose of the working
fluid. No emissions in the environment!
Oil residuals must not reach the ground and must be disposed of with the special waste.
Bring the emptied unit to recycling.