![thermofin X-TDH.3-100-22-G-N-D5-BC-04 Operating And Installation Instructions Download Page 23](http://html1.mh-extra.com/html/thermofin/x-tdh-3-100-22-g-n-d5-bc-04/x-tdh-3-100-22-g-n-d5-bc-04_operating-and-installation-instructions_1105574023.webp)
Operating and installation instructions
08.02.2021 – Version 1.1
Dry cooler
X-TDH.3-100-22-G-N-D5-BC-04
Page: 23/31
Operating and installation instructions for dry cooler translation into English © thermofin GmbH
5.3 Electrical switching and control devices
thermofin® optionally supplies different versions with repair or motor protection switches, phase
control or frequency controllers as well as combinations of the same, pre-wired on request. A
functional test should be carried out here at regular intervals. Cables and components are to be
subjected to a visual inspection, clamping points must be checked for tightness. You must also check
whether the set parameters still match the system configuration.
All components removed, loosened or dismantled for cleaning or control purposes must be
properly reinstalled and checked for function after completion of the work!