UltiMate 3000 Series:
SRD-3x00 Solvent Racks
Operating Instructions
Page
23
4 Preparation for Operation (Startup)
4.1 Overview
After you have unpacked, positioned, and connected the SRD described in sections 3.1
through 3.4 (
→
page 17 and following pages), prepare the SRD for operation:
1.
Connect drain tubing (
→
section 4.2).
2.
Connect the solvent reservoirs, and then connect the solvent supply lines to the
degassing channels (
→
page 24).
3.
Select one of the following alternatives:
•
To operate the SRD with the pump of the UltiMate 3000 System
Connect the pump to the degassing channels (
→
page 27).
•
Standalone Operation
Connect the degassing channels as required by your application.
4.2 Connecting Drain Tubing
To discharge liquid leaks that might have accumulated in the interior, the SRD has a drain
port at the bottom right of the instrument.
Fig. 6: Drain port
Direct liquid leaks to waste through the drain system of the UltiMate 3000 system. The
required components are shipped with the UltiMate 3000 pumps, NCS-3500RS and NCP-
3200RS, but can be ordered also separately. The drain kit (part no. 6040.0005) includes all
required components and detailed installation instructions.
Summary of Contents for SRD-3200
Page 2: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Operating Instructions ...
Page 4: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page II Operating Instructions ...
Page 28: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 22 Operating Instructions ...
Page 34: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 28 Operating Instructions ...
Page 44: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 38 Operating Instructions ...
Page 54: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 48 Operating Instructions ...
Page 56: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 50 Operating Instructions ...
Page 60: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 54 Operating Instructions ...
Page 62: ...UltiMate 3000 Series SRD 3x00 Solvent Racks Page 56 Operating Instructions ...