14
A79210100 - Iss 2
Shandon ClearVue™ Operator Guide
DRAFT
2 - Basic Operation
The following chapter describes the basic operational tasks
required to run the Shandon ClearVue on a daily basis.
2-1 - Daily Tasks
2-2 - Weekly Tasks
2-3 - Changing the Carbon Filter
2-4 - Filling the Xylene Tray
2-5 - Filling the Mountant bottle
2-6 - Changing the Purge Tray and Debris Tray
2-7 - Starting up the Shandon ClearVue
2-8 - Filling the Dispense head Cleaning Station
2-9 - De-Gassing the Mountant bottle
2-10 - Flushing the System
2-11 - Purging the System
2-12 - Changing the Coverslip hopper
2-13 - Loading baskets
2-14 - Unloading baskets
2-15 - Shutdown Procedure
Summary of Contents for Shandon ClearVue A79210100
Page 96: ...96 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT 5 2 2 Mountant Jar...
Page 119: ...Shandon ClearVue Operator Guide A79210100 Iss 2 119 DRAFT C2 Packing Instructions...
Page 120: ...120 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Appendix D Screen Maps A B...
Page 121: ...Shandon ClearVue Operator Guide A79210100 Iss 2 121 DRAFT A 1 3 2 4 5 1 2 4 3 5 A...
Page 122: ...122 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT B 1 3 2 4 5 7 6 8 1 3 5 7 2 4 6 8...
Page 123: ...Shandon ClearVue Operator Guide A79210100 Iss 2 123 DRAFT Appendix E Declaration of Conformity...
Page 124: ...124 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Index...
Page 125: ...Shandon ClearVue Operator Guide A79210100 Iss 2 125 DRAFT...