74
A79210100 - Iss 2
Shandon ClearVue™ Operator Guide
DRAFT
Description
Possible Cause
Solution
Broken Laydown:
Small breaks at beginning
of laydown
Uniform middle strip
•
•
Too much ‘suckback’.
Contact Thermo Fisher Scientific
Service Department.
Backlash in
Mountant Pump
.
Contact Thermo Fisher Scientific
Service Department.
Non-approved mounting reagent
used.
Use approved mounting reagent
(see
Appendix B
).
‘Kite-Shaped’ Laydown:
Laydown begins too
far down the slide and
encroaches onto the
frosted area.
Abnormally large middle
strip.
Drips continue after main
laydown.
•
•
•
Blocked
Dispense Head
.
Clean
Dispense Head
(see
Section 5-2-8
)
•
Damaged
Dispense Head
.
Contact Thermo Fisher Scientific
Service Department.
Excessive air in
Syringe
.
Flush
system until all bubbles
have been expelled.
Direction of Dispense
Direction of Dispense
Direction of Dispense
Summary of Contents for Shandon ClearVue A79210100
Page 96: ...96 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT 5 2 2 Mountant Jar...
Page 119: ...Shandon ClearVue Operator Guide A79210100 Iss 2 119 DRAFT C2 Packing Instructions...
Page 120: ...120 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Appendix D Screen Maps A B...
Page 121: ...Shandon ClearVue Operator Guide A79210100 Iss 2 121 DRAFT A 1 3 2 4 5 1 2 4 3 5 A...
Page 122: ...122 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT B 1 3 2 4 5 7 6 8 1 3 5 7 2 4 6 8...
Page 123: ...Shandon ClearVue Operator Guide A79210100 Iss 2 123 DRAFT Appendix E Declaration of Conformity...
Page 124: ...124 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Index...
Page 125: ...Shandon ClearVue Operator Guide A79210100 Iss 2 125 DRAFT...