General Preinstallation Information
Operating Environment
Thermo Scientific
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision B)
6-7
Power Conditioning Devices
Various line voltage conditioning devices are available that can correct
your line voltage problem. If you have good regulation, but the power
line disturbance analyzer shows transient voltages, an isolation/noise
suppression transformer should be adequate to resolve the problem. If
there are both transient and regulation problems, you should consider
power conditioners, which can control both of these problems.
Your electrician should install the buck/boost transformer before the
installation of your system is started.
Uninterruptible Power Supply
If your local area is susceptible to corrupted power or power disruptions,
an uninterruptible power supply (UPS) should be installed in your
laboratory.
Tip
For compliance and safety, ensure that your power conditioning
devices are certified by recognized domestic and international
organizations (for example, UL, CSA, TÜV, and VDE).
Tip
For compliance and safety, ensure that your uninterruptible power
supply (UPS) devices are certified by recognized domestic and
international organizations (for example, UL, CSA, TÜV, and VDE).
Summary of Contents for iCAP Qnova Series
Page 1: ...iCAP Qnova Series ICP MS Pre Installation Requirements Guide BRE0006946 Revision B April 2018 ...
Page 2: ......
Page 3: ...BRE0006946 Revision B April 2018 iCAP Qnova Series ICP MS Pre Installation Requirements Guide ...
Page 92: ......
Page 93: ......
Page 94: ......