Site Preparation
Dimensions and Weights
Thermo Scientific
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision B)
2-7
10. Rest the back part of the instrument on the bench and slide it into
the desired position.
The rear three of the six support points beneath the instrument, see
, consist of synthetic material that has a low frictional
resistance and should easily slide above the surface of your work
bench.
11. When the final position for the instrument is reached, slowly lower
the front of the instrument.
The front three of the six support points beneath the instrument
consist of synthetic material that has a high frictional resistance and
should keep the instrument safely in position.
12. To remove the lifting devices from the handles, continue with
“Dismounting the Lifting Device and Securing the Handles”
.
Dismounting the Lifting Device and Securing the Handles
After the instrument has been moved to the correct position for
operation, dismount the lifting device and store away the handles on the
left side. At the right side of instrument, the handles can also be used to
mount a drip tray.
Labeled Components: 1=front support points (3 ×) with high resistance to
prevent moving, 2=rear support points (3 ×) with low resistance to easily
slide the system on bench top
Figure 2-6.
Support points with different resistance
1
2
Summary of Contents for iCAP Qnova Series
Page 1: ...iCAP Qnova Series ICP MS Pre Installation Requirements Guide BRE0006946 Revision B April 2018 ...
Page 2: ......
Page 3: ...BRE0006946 Revision B April 2018 iCAP Qnova Series ICP MS Pre Installation Requirements Guide ...
Page 92: ......
Page 93: ......
Page 94: ......