![Thermo Scientific DensityPRO NAI Series User Manual Download Page 47](http://html.mh-extra.com/html/thermo-scientific/densitypro-nai-series/densitypro-nai-series_user-manual_1105169047.webp)
Startup & the Setup Wizard
The Setup Wizard
Thermo Scientific
DensityPRO User Manual
3-17
Standardization
1.
Select Standardization and click the Next button to advance to the following
screen.
Figure 3-14.
Standardization Condition, Sample Time & Density
This screen defines the standardization condition, the standardization time and the
density of the material in the pipe at standardization.
Standardization On – The four options for the standardization condition are
None, Pipe Full, Pipe Empty or Bypassed.
Select None to bypass the setting.
Pipe Full is the most common selection and should be used anytime there
is carrier or process material in the pipe during a standardization.
Pipe Empty may be used in certain selected conditions where the presence
of process material is being simulated by a calibration block or some other
means.
Caution:
The Bypass option should only be used if recommended by a
Thermo Fisher technical support specialist. This option inserts a value of one
for the standardization count, which under some circumstances can have
detrimental effects.
Summary of Contents for DensityPRO NAI Series
Page 2: ......
Page 4: ......
Page 6: ...This page intentionally left blank ...
Page 8: ...This page intentionally left blank ...
Page 14: ...xiv DensityPRO User Manual Thermo Scientific This page intentionally left blank ...
Page 134: ......
Page 158: ......
Page 195: ......